
(
7
)操作板的安装
/ Installing the operation panel
(
8
)电缆的处理
/ Managing the cord
请一边慢慢地放倒缝纫机,一边确认电缆没有被勾住。
►
注意:放倒缝纫机时,请确认机头支撑杆安装在台板上。
Slowly tilting the sewing machine, check that the cords are not forcibly pulled.
►
CAUTION
:
When you tilt the sewing machine, make sure that the sewing machine
head support bar is placed on the table.
用木螺钉 把操作板座 固
定到台板上,再把电缆穿过
台板孔 。
Install hook oil shield plate
onto bed base with setscrew
.
10
Summary of Contents for 5780BS
Page 4: ...3 Standard sewing shape list 3...
Page 5: ...3 Standard sewing shape list 4...
Page 20: ...V 1 1 1 2 1 3 2 1 2 2 3 4 0 05mm 3 0 0 2mm 19...
Page 31: ...1...
Page 34: ...4...
Page 37: ...7...
Page 39: ...47 10009074 SCREW M4 L 4 2 48 10052927 NEEDLE CONNECTING ROD ASSEMBLY 1 9...
Page 40: ...10...
Page 42: ...12...
Page 45: ...15...
Page 47: ...17...
Page 50: ...20...
Page 53: ...23...
Page 55: ...25...
Page 57: ...27...
Page 58: ...28...