SINGLE PHASE WIRING INSTRUCTIONS

 

FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE HANDLING.

  

Single phase pumps are 

supplied with a 3-prong grounded plug to help protect you against the possibility of electrical shock.

 

DO NOT UNDER ANY CIRCUMSTANCES 

REMOVE THE GROUND PIN.

  

The 3-prong plug 

must

  be inserted into a mating 3-prong grounded receptacle. If the installation does not 

have such a receptacle, it must be changed to the proper type, wired and grounded in accordance with the National Electrical Code 

and all applicable local codes and ordinances.

 

“Risk of electrical shock”

  

Do not remove power supply cord and strain relief or connect conduit directly to the pump.

 Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician.

 Units supplied without a plug (single and three phase) and single phase nonautomatic units with a 20 amp plug must 

have a motor control and liquid level control provided at time of installation. The control device should have suitable voltage, ampere, 

frequency, grounding and horsepower rating for the pump to which it is connected.

NONAUTOMATIC

WIRING DIAGRAM

AUTOMATIC

WIRING DIAGRAM

153224

153223

1.  All power circuits must be disconnected and locked out before any 

attempts are made at servicing. The cutter rotor and disc can be 

removed and sharpened by grinding the cutting faces. Both rotor and 

disc must be removed from the pump. Removal of these parts can 

be accomplished in the field by removing pump from the sump and 

positioning horizontally to access the intake of the pump. If seals or 

other repairs are required, the pump must be totally removed and 

serviced  in  a  shop  by  a  qualified  pump  technician  or  authorized 

service center.

2.  Thoroughly clean the cutter rotor and disc assembly. Tilt pump 

back to the vertical position to make certain the end play has been 

removed. Check and record the clearance between the rotor and 

disc with a feeler gage. The correct running clearance is between 

0.003" (0.076 mm) and 0.008” (0.203 mm).

3.  With pump in horizontal position, heat the hex head bolt in the center 

of the rotor with a propane torch. The bolt must be heated to 350° 

F (177° C) to soften the thread lock sealer on the bolt for ease of 

removal. Remove the bolt by turning in a counterclockwise rotation. 

It will be necessary to use a wood block to prevent the rotor from 

turning while removing the bolt. Pull rotor from the shaft and remove 

the spacer shims located behind the rotor.

4.  Remove the screws holding the disc and remove disc from the pump.
5.  The disc and the rotor cutter can be replaced with new service 

parts or resurfaced by grinding. Resurfacing is accomplished by 

surface  grinding  both  disc  and  rotor  to  a  32  micro  finish.  Do  not 

attempt  grinding  in  the  field.  Send  parts  to  a  qualified  machine 

shop for repair. The disc, rotor and shims are a matched set. Keep 

parts together. Measure disc before and after resurfacing with 

micrometer and record measurements. 

6. 

After resurfacing, the disc and rotor must be flat within 0.001” (0.025 

mm). If the disc has been surface ground, it will be necessary to 

remove shims to compensate for the material removed from the 

disc plus any amount over 0.008” (0.203 mm) measured in the field 

(step 2, above) before the rotor and disc were disassembled from 

the pump. The shim thicknesses and disc should be measured 

with a micrometer and the amount removed from the disc plus any 

clearance over 0.008” (0.203 mm) must match the shim thickness 

being removed.

7.  Clean bottom of pump where disc is located and replace disc 

and retainer screws. Replace rotor with the correct shims. Install 

washer and torque to 30 in.-lbs. apply Loctite 262 thread-lock 

sealant or equal to bolt threads prior to insertion. Check running 

clearance with pump in vertical position to remove end play. 

Clearance must be between 0.003" (0.076 mm) and 0.008” (0.203 mm) 

to obtain efficient grinding when the pump is put back in service. 

8.  Check the oil in the motor housing on 803/805/807 pumps before 

reinstalling. The level should be even with the fill plug when pump is 

in the upright position. Add oil if required. Use insulating oil supplied 

by the factory. 

REPAIRS

These are the original installation instructions.

MOTOR

RUN

OVERLOAD

START

FLOAT

RELAY

1

2

5

4

2

1

3

SWITCH

COM

NC

L1 - BLACK

GREEN

L2 - WHITE

WHITE

BLACK

WHITE

START CAPACITOR

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

RUN CAPACITOR

MOTOR

RUN

OVERLOAD

START

RELAY

1

2

5

L1 - BLACK

GREEN

L2 - WHITE

WHITE

WHITE

START CAPACITOR

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

RUN CAPACITOR

Summary of Contents for The Shark Series

Page 1: ...king or removing cutter 1 Zoeller Grinder Pumps are designed for grinding and pumping sewage from homes The pump is intended to grind and pump all normal sewage including reasonable quantities of disp...

Page 2: ...nd gravel or dirt 4 DO be sure that the area is large enough to allow proper clearance for the level control switch es to operate properly 5 DO Always Disconnect Pump From Power Source Before Handling...

Page 3: ...y and all codes 11 For nonautomatic pumps locate float switches as shown in sketches The best place for the off point is above the motor housing and positioned 180 from the inlet Never put off point b...

Page 4: ...ed to 350 F 177 C to soften the thread lock sealer on the bolt for ease of removal Remove the bolt by turning in a counterclockwise rotation It will be necessary to use a wood block to prevent the rot...

Page 5: ...necte un conductor directamente a la bomba Siest da adoelcableel ctricosedebereemplazarlounrepresentante authorizado por Zoeller 9 La bomba contiene aceite lo que se pone presurizado y caliente cuando...

Page 6: ...de conexi n herm tica NO transporte o levante la bomba por su cable de alimentaci n el ctrica NO use un cable de extensi n 6 INSTALE una v lvula de retenci n y una uni n en la tuber a de descarga NO...

Page 7: ...la ubicaci n de los interruptores de flotador es como se muestra en los esquemas El punto off apagado debe estar por encima de la carcasa del motor y a 180 de la entrada Nunca ubicar el punto off d b...

Page 8: ...bombas o en un centro de servicio autorizado 2 Limpie a fondo el cortador en forma de estrella y el conjunto de disco de acero inoxidable Incline la bomba hacia atr s hacia la posici n vertical para a...

Page 9: ...ce type de pompe dans une piscine de nata tion et des zones marines n a pas t tudi 12 Il ne faut pas essayer de tourner avec les doigts le couteau qui se trouve au fond de l appareil Utiliser une cl...

Page 10: ...jours brancher la pompe sur un circuit s par mis la terre IL NE FAUT JAMAIS couper faire une pissure ou endommager un cordon d alimentation Pour faire une raccordement il faut utiliser un bo tier de r...

Page 11: ...re au dessus du carter du moteur et 180 de l admission Le point d arr t ne se doit trouver jamais au dessous du refoulement de la pompe 12 Pour viterlapropagationdesgazetdesodeurs touteslesinstallatio...

Page 12: ...Nettoyer soigneusement le rotor et le disque Incliner la pompe la verticale pour s assurer que le jeu axial a t retir V rifier et noter le d gagement entre le rotor et le disque l aide d une jauge d...

Reviews: