
Qwik Jon
®
Ultima Qwik Reference Guide
STEP 1
Location Selection
Plan your new installation carefully.
Floor:
The
should be structurally sound and level within
3 mm (1/8"). If the
is not level, use hydraulic cement or
similar material to level the
Electrical:
A 220 volt receptacle will be needed to supply
electrical power to the pump.
Sewage:
Access to a sewage line is required. The Qwik Jon
®
Ultima requires an outside diameter Ø32 mm or 1" (or outside
A ball or gate valve should be installed in the discharge line.
Carbon filter vent:
The use of a mechanical
vent system is NOT recommended
as the toilet will not
NOTE:
If a built-in installation is to be used, locate the pump
unit in an area that will allow access to the pump and switch.
OUTLET
WATER
SUPPLY
DISCHARGE
PIPE
LEVEL FLOOR
BALL OR GATE VALVE
SOLD SEPARATELY
SK2588
STEP 2
Leveling of Pump Unit
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do
not puncture the pump unit!
Level the pump unit to within 3 mm (1/8")using hydraulic cement
or similar material.
EA0062
Dimensions
EA0061
Install carbon filter vent.Please replace
the carbon filter periodically, no need to
install vent pipe.
Please replace the carbon filter periodically.
© Copyright 2018 Zoeller Co. All rights reserved.
- 6 -
237
480
235
517
89
364
178
326
110
45
Unit : mm
Water:
A water supply will be needed to operate the toilet.
valve is
(18-7/8")
(9-1/4")
(14-3/8")
(20-3/8")
(3-1/2")
(1-3/4")
(12-7/8")
(9-3/8")
(4-3/8")
(7")
diameter Ø25 mm or 3/4" if your codes permit) sewage
discharge line to connect to an existing sewage line.
Usually an outside diameter Ø20 mm (1/2") line with a shut-off