background image

11

© Copyright 2021. All rights reserved.

Your Zoeller Pump Company Recirculating Media Filter (RMF) is 

one component of your onsite wastewater system.  Your system 

consists of a primary treatment device (septic tank), secondary 

treatment  device (Zoeller Pump Company RMF), and a soil distribution 

component (gravity or pressurized leach lines or a drip field).  Your 

recirculating media filter requires periodic maintenance.  Please 

read the maintenance instructions and be sure that each procedure 

is accomplished in the proper time frame.  These instructions also 

include guidance for septic tank maintenance.   These maintenance 

procedures should be carried out by a well-trained professional 
onsite service entity.

Input Inspection Schedule

Residents of every home discharging into an onsite system need to do 

an annual inspection of inputs to their onsite system.  This includes 

organic (non-water) as well as hydraulic (water use) wastes.  Annual 

home inspection includes:

1.  Review original “Septic System Do’s and Don’ts”.   Note any 

changes in household habits and make corrections as needed.

2.  Inspect all faucets and toilets in the house and make sure they 

are not leaking.     

Septic Tank Maintenance Procedures and Schedule

Each septic tank requires periodic maintenance.  Maintenance 

includes:

1.  Inspections need to be done twice annually.  Riser cover must 

be removed, septic tank must have sludge level recorded and 

scum layer observations recorded.  If the sludge layer is within 

12 inches of the bottom of the effluent filter, the tank should be 

pumped.  This will likely be every 3 to 5 years for most homes.  

2.  Septic tank effluent filter can be removed and cleaned with 

each septic tank inspection.  The Zoeller Pump Company  WW1 

Filter (170-0078) filter body is removed and the  filtered material 

held by the filter is rinsed off the filter back into the tank.  The 

outer element which provides bypass protection needs to be 

cleaned and can be removed after replacing the inner element.  

Simply withdraw the whole inner and outer element as a unit, 

which is the reverse of installation.  Disassemble on the surface 

and rinse any filtered material into the septic tank.  

3.  Inspect all baffles, risers and covers.  After inspections, secure 

riser lid with tamper resistant screws or lock.  

Zoeller Pump Company Recirculating Media Filter 

Maintenance Procedures and Schedule

Each recirculating media filter requires periodic maintenance.  

Maintenance includes:

1.  Annual cleaning of the lateral effluent distribution network.  

Riser lids for each lateral (located within the media filter) must 

be removed and end caps of each lateral located and removed.  

Each lateral needs to be brushed with a bottlebrush and flushed 

by manually activating the dosing pump.  

2.  Any cleanout risers that have been damaged or buried need to be 

replaced or brought back to grade.    

3.  Inspect buried horizontal fence material annually. Horizontal fence 

material must remain in place to prevent surface access to liquid 

being treated.  

4.  Weeding may be necessary from time to time.

Zoeller Pump Company Tru-Flow

®

 Splitter 

(p/n 173-0003) Schedule

Each Zoeller Pump Company Tru-Flow

®

 Splitter must be annually 

inspected.

1.  Remove riser cover and using a flashlight inspect component for 

level (using bubble level), 

2.  Inspect for dirt or scum buildup on splitter.  If necessary, flush 

with garden hose.   

3.  Replace cover.

Recirculation Chamber Maintenance Procedures and 

Schedule

Each recirculating chamber requires periodic maintenance; 3 months 

after start-up and annually thereafter. 

1.  The dosing chamber should be inspected annually.  

 

Power needs to be shut off at the breaker for this inspection.  

2.  Riser and lid integrity needs to inspected

3.  Electrical connections need to be inspected for water and corrosion.   

Repairs need to be made when corrosion is found.  The use of 

watertight wire nuts is required. 

4.  Float control operation needs to be inspected.  Any hindrance to 

float movement must be corrected.  

5.  Excessive scum and sludge in the pump tank must be removed.  

 

Electrical Components Maintenance Procedures and 

Schedule

Each electrical component must be inspected annually.  

1.  Be sure each panel has a wiring diagram included.  

2.  Inspect panel for corrosion and obvious problems such as water 

or odor in the panel.

3.  Note pump cycle and hour meter readings.  These should be 

recorded in the panel and in the technicians log.  

4.  Read voltages and amps and compare to start-up.       

With pump power on, float operation must be confirmed.  Using a plastic 
rod, floats can be moved up or down and on/off and alarm switching tested.

Operation and Maintenance

Summary of Contents for N153

Page 1: ... ensure a long and problem free life for the system but also save time and money during installation Should further assistance be necessary please call Zoeller Pump Company at 1 800 928 7867 Table of Contents Safety Instructions 1 Limited Warranty 2 Troubleshooting Service Checklist 2 Preinstallation Checklist 3 Gravity Discharge System Installation 4 6 Pump Discharge System Installation 7 9 Syste...

Page 2: ...dateoforiginalmanufactureoftheproduct whichevercomesfirst that inspections determine to be defective in material or workmanship will be repaired replaced or remanufactured at manufacturer s option provided however that by so doing we will not be obligated to replace an entire assembly the entire mechanism or the complete unit No allowance will be made for shipping charges damages labor or other ch...

Page 3: ...ow for additional materials required Zoeller Pump Company Recirculating Media Filter Kit Includes Zoeller Pump Company patented WW1 septic tank effluent filter 800 GPD or less Proven quality effluent pump s Factory assembled dose tank discharge assembly Factory assembled media filter distribution piping with cleanouts Orifice shields Cleanout risers EPDM rubber liner Drain collection system for me...

Page 4: ...stall the overall system General System Installation Outline 1 Install septic tank 2 Install building sewer line as required to septic tank 3 Install dosing tank 4 Install piping between septic tank and dosing tank 5 Install dosing tank pump 6 Install wiring from dosing pump to control panel 7 Install media filter see detailed instructions below 8 Install force main from dosing tank to media filte...

Page 5: ...ATED WOOD OR CONCRETE FRAME SUPPLIED BY OTHERS FILTER MEDIA NATIVE SOIL MUST BE SMOOTHED RAKED COMPACTED AND LEVELED THROUGHOUT THE LENGTH AND WIDTH 4 BERM MINIMUM PATIO STONE CLEAN OUT RISER 90 SWEEP ELBOW 4 X 3 PVC RISER MALE NPT ADAPTER CAP PROTECTIVE BARRIER SCREENED VENT PROTECTIVE BLANKET UNDER 45 MIL EPDM RUBBER LINER 8 OF 3 4 TO 1 1 2 DIAMETER UNDER DRAIN MEDIA 24 OF FILTER MEDIA 4 SLOTTED...

Page 6: ... clamp around the boot onto 4 penetration pipe and tighten Apply a bead of Firestone lap sealant caulk where the pipe boot meets the pipe 13 Attach the 4 pipe cap or screened vent riser to the opposite end of the drainpipe 14 Cutthedrainpipetorequiredlengthandattachittothepenetration pipe using the 4 coupling Drainpipe should extend as close as possible to opposite support wall 15 Slide the 1 1 4 ...

Page 7: ...een septic tank and dosing tank 5 Install dosing tank pump 6 Install wiring from dosing pump to control panel 7 Install media filter see detailed instructions below 8 Install force main from dosing tank to media filter 9 Install media filter pump 10 Install wiring from media filter pump to control panel 11 Install return line from media filter to 80 20 pressure flow splitter 12 Install 80 20 press...

Page 8: ...DIA 11 MAXIMUM OF 3 4 1 1 2 DIAMETER PEA GRAVEL ELEVATION VIEW NATIVE SOIL MUST BE SMOOTHED RAKED COMPACTED AND LEVELED THROUGHOUT IT S LENGTH AND WIDTH 1 5 8 MINIMUM OF 3 4 1 1 2 DIAMETER PEA GRAVEL FILTER MEDIA LINER PIPE BOOT ALL STAINLESS PIPE CLAMP FRAME 1 1 4 PVC PIPE 24 6 PIPE FROM PUMP MAY NEED TO BE LARGER 2 PVC PIPE J BOX PREWIRED CONDUIT RISER LID TO 80 20 PRESSURE FLOW SPLITTER 4 SLOTT...

Page 9: ...nd the boot onto 1 1 4 penetration pipe and tighten Apply a bead of Firestone lap sealant caulk where the pipe boot meets the pipe 21 Slide the 1 1 4 penetration pipe into the discharge seal boot The seal boot may need trimmed to the appropriate diameter The boot should fit snug with no wrinkles 22 Place the hose clamp around the boot onto 1 1 4 penetration pipe and tighten Apply a bead of Firesto...

Page 10: ...s to aid in the set up Recirculation ratio must be taken into account when adjusting for the daily design flow rate The homeowner and maintenance contract personnel must receive a copy of the following documents 1 Recirculating Media Filter literature sheet CL0062 2 Recirculating Media Filter Owner s Manual CL0064 3 Control Panel Wiring Diagram 4 Control Panel Installation Instructions and Operati...

Page 11: ...re riser lid with tamper resistant screws or lock Zoeller Pump Company Recirculating Media Filter Maintenance Procedures and Schedule Each recirculating media filter requires periodic maintenance Maintenance includes 1 Annual cleaning of the lateral effluent distribution network Riser lids for each lateral located within the media filter must beremovedandendcapsofeachlaterallocatedandremoved Each ...

Page 12: ...eller Pump Company products must be installed and maintained in accordance with all applicable codes Product information presented here reflects conditions at time of publication Consult factory regarding discrepancies or inconsistencies Notes ...

Reviews: