Zoeller 900 Series Installation Instructions Download Page 4

4

© Copyright 2015 Zoeller

®

 Co. All rights reserved.

SK2921

1.    With basin installed in floor, remove cover from basin. 

2.    Remove M53 pump and M53 with backup pump from cartons.
3.    Thread all power cords through cord hole in cover and insert cords in    

  3-hole cord seal.  Place lubricant on O.D. of cord seal and insert into cover. 
4.  Put M53 pump cord through appropriate cord hole in cover and insert cord              

      in 1 hole cord seal.  Place lubricant on O.D. of cord seal and insert in cover.
 

NOTE:

 Adjust cords as necessary to eliminate interference of cords  

 

  with floats, switches, etc.

5.  Place pumps in basin oriented as shown in Fig. 2.
6.  Assemble PVC pipe coupling to the backup pump discharge pipe and  

 

      insert 1.5" pipe x 15" long in coupling by solvent welding (PVC glue). See Fig. 1.

7.  Assemble 1.5" MPT x 1.5" socket adapter to M53 pump discharge (Fig.1).

8. 

Assemble PVC pipe (1.5" x 32" long with weep hole) in adapter by solvent   

       welding (Fig. 1).
9.  Assemble cover to basin making sure that discharge pipes align with  

 

  appropriate holes in cover. See Fig. 3.  Attach vent using 3" NPT flange on   

  cover.  Use full-size discharge pipe. 
10. Refer to Installation Instructions FM2562 for additional details pertaining to  

  the "Pro Pak" System.

 

NOTE:

  Cover must be oriented per instructions (Fig. 3).  Basin must be in  

  accordance with applicable codes and specifications.  Pump must be level  

  and float mechanisms clear of sides of basin before starting pump.  Basin  

  must be clean and free of debris after installation.

INSTALLATION INSTRUCTIONS FOR 24 X 30 DUPLEX BASIN ASSEMBLY

10 1/2

30

1 1/2 DISCHARGE

(2) PLACES

2 1/2 HOLE FOR

3-HOLE CORD SEAL

2 1/2 HOLE FOR

1-HOLE CORD SEAL

3" VENT FLANGE

INSPECTION HOLE

  FIG. 3

24" COVER

  FIG. 1

  FIG. 2

APPROX.30°

PUMP STAND

SOLVENT WELD HERE

SOLVENT WELD HERE

4" INLET HUB

3/16 DIA. WEEP HOLE

MAIL TO:  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO:  3649 Cane Run Road • Louisville, KY  40211-1961

(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624

Visit our web site:

zoellerpumps.com

Summary of Contents for 900 Series

Page 1: ...ANDLING Single phase pumps are supplied with a 3 prong grounded plug to help protect you against the possibility of electrical shock DO NOT UNDERANY CIRCUMSTANCES REMOVETHEGROUNDPIN The3 prongplugmustbeinsertedintoamating3 pronggrounded receptacle If the installation does not have such a receptacle it must be changed to the proper type wired and grounded in accordance with the National Electrical ...

Page 2: ... becomes pressurized and hot under operating conditions allow 2 hours after disconnecting before attempting service SERVICE CHECKLIST CONDITION COMMON CAUSES A Pump will not start or run Checkfuse lowvoltage overloadopen openorincorrectwiring openswitch impellerorsealboundmechanically defective capacitor or relay when used motor or wiring shorted Float assembly held down Switch defective damaged o...

Page 3: ...Use full size discharge pipe NOTE Cover must be oriented per instructions Fig 3 Basin must be in accordance with applicable codes and specifications Pump must be level and float mechanisms clear of sides of basin before starting pump Basin must be clean and free of debris after installation 7 Refer to Installation Instructions FM2562 for additional details pertaining to the Pro Pak System INSTALLA...

Page 4: ...hole in adapter by solvent welding Fig 1 9 Assemble cover to basin making sure that discharge pipes align with appropriate holes in cover See Fig 3 Attach vent using 3 NPT flange on cover Use full size discharge pipe 10 Refer to Installation Instructions FM2562 for additional details pertaining to the Pro Pak System NOTE Cover must be oriented per instructions Fig 3 Basin must be in accordance wit...

Reviews: