RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
STEP 3
Apply glue on every piping connection.
Check
valve
Ball
valve
Inlet hub
2” Pipe
2” Pipe
Union
Pipe
600 mm
(23-19/32")
cut off 4” inlet before installing the inlet hub
(Length 90 mm
(3-1/2"))
Coupling
(Length 200 mm
(7-7/8"))
For reference only
(15~20mm)
2” Pipe
2" BSPT slip
2" NPT slip
or
1-1/4” Pipe
2” Pipe
1-1/4” NPT Slipe
1-1/4” to 2” Reducer
Grinder pump only
or
(Option)
(Option)
(Option)
DN50
Pipe
DN50
DN100 Pipe
2" BSPT slip
2" NPT slip
or
2" BSPT slip
2" NPT slip
or
Summary of Contents for 222
Page 14: ...1 4 2 3 5 6 8 9 7 10 11 4 12 13 3 14 14 1 5 5 1 2 3 4 A D Zoeller F G E B C 2019 Zoeller...
Page 18: ...18 2019 Zoeller...
Page 20: ...20 A 2019 Zoeller 1 2 3 4 5 140mm min B C A B A...
Page 23: ...SK1217 SK1218 23 2019 Zoeller FM0526 PVC 10 1457 3 3 L1 L2 1 2 L3 013071 006848 20 P N 10 0748...