background image

1

EN

Only a person qualified in the technical fields concerned (electricity, hydraulics or refrigeration) is authorised to 

perform this procedure. The qualified technician working on the appliance must use/wear personal protective 

equipment (such as safety goggles and protective gloves, etc.) in order to reduce the risk of injury occurring 

when working on the appliance.

Before handling the machine, ensure that it is switched off and isolated. 

Parts supplied

1 metal sheet to attach the duct 

to the heat pump 

1  strip  of  aluminium  adhesive 

tape

4 long 4 washers

1 duct (3.3 meters maximum) +1 metal sheet to attach the 

duct to the heat pump + 1 frame to attach the duct to the wall 

in the technical premises

1 metal cable + 1 plastic duct + 1 tensioner

4 self-boring screws

2 grill attachment frames (to be 

sealed) 

2 grills 

 

 

 

 

 

 

 

Installation procedure

• 

It is vital that this procedure is carried out to the end to ensure that the appliance operates correctly,

• 

The appliance must be installed in a ventilated technical room, free from freezing temperatures, all traces 

of damp and stored pool maintenance products. 

• 

Only the connection kit supplied must be mounted on the blowing machine.

• 

Bring in the fresh air using the second grill provide in the kit; this fresh air must come directly from the 

exterior ambient air and not from a room adjacent to the technical room.

• 

The exterior air must be brought in by lowering the pressure in the technical room.

• 

Check that this type of assembly does not hinder the other technical appliances in this room.

Reviews: