Zodiac MilPro ERB 310 Owner'S Manual Download Page 9

8/16 

INFLATION USING A COMPRESSED AIR DIVING BOTTLE GENERAL 

 
Quick inflation can be achieved using a 12 Litre compressed air diving bottle, fitted with a single high 
pressure hose and inflation valve adaptor. 

 

The inflation system consists of: 

 

1 high pressure hose, 

 

1 regulator manometer, 

 

1 inflation valve adaptor, 

 

1 diving bottle. 

 
 
INFLATION BOTTLE AND KIT 

 

Illustration in page 13 

 
The  inflation  bottle  can  stay  in  its  sheath,  secured  to  the  floor  in  front  of  the  transom,  during 
navigation. Usually, enough air remains in order to allow additional inflation if needed. 
 
The  inflation  bottle  must  be  filled  up  on  a  diving  bottle  filling  bench  as  per  standard  regulations 
applicable to diving bottles. 
 
 
INFLATING THE BOAT USING THE COMPRESSED AIR DIVING BOTTLE 
 

 

Remove the compressed air cylinder from it’s sheath near the transom. 

 

 

Screw the regulator (1) to the diving bottle (5). 

 

 

Remove the caps to the inflation valves and ensure the diaphragm is in the closed position. 

 

 

THE CAPS ON THE 0VER PRESSURE VALVES MUST BE REMOVED. 

 

 

Push the valve adapter on the end of the high-pressure hose into the valve on the buoyancy tube, 
keel or high pressure floor. 

 

 

Inflate  the  buoyancy,  while  balancing  the  pressure  between  different  compartments  until  the 
bulkheads (a) are no longer visible (pressure = 240 mb). 

 
 

 

warning 

DURING  QUICK  INFLATION,  CAPS  OF  OVERPRESSURE  VALVES 
MUST BE REMOVED. 
STOP THE INFLATION IMMEDIATELY IF THESE CONDITIONS ARE 
NOT MET. 

 

 

 

Summary of Contents for MilPro ERB 310

Page 1: ...BOATS EMERGENCY RESPONSE BOATS EMERGENCY RESPONSE BOATS LIRE ATTENTIVEMENT CE MANUEL AVANT LA MISE EN SERVICE DE VOTRE ZODIAC LIRE ATTENTIVEMENT CE MANUEL AVANT LA MISE EN SERVICE DE VOTRE ZODIAC LIR...

Page 2: ...ecifications and assembly instructions for the boat and its equipment SERIE ERB ERB 310 SUMMARY Page Page Putting the boat into use 2 Storing the inflated boat after use 12 Inventory upon opening 2 Op...

Page 3: ...T INFLATION 6 Inflate the keel 7 BOAT INFLATION 7 Adjust the pressures 9 AIR PRESSURE 8 Store the boat 11 DEFLATION FOLDING warning FOR DETAILS ON QUICK INFLATION REFER TO PAGE 8 INVENTORY UPON OPENIN...

Page 4: ...tion position Deflation position Valve closed the inner button springs upwards Valve open the inner button pushes down and twists to the left INFLATION VALVE IN THE HIGH PRESSURE FLOOR 1 Cap 2 Valve i...

Page 5: ...NOT TRY AND INFLATE THE BOAT THROUGH THE PRESSURE REFLIEF VALVE SEVERE DAMAGE MAY OCCUR NOTE THE PRESSURE RELIEF VALVES ARE SET TO OPEN WHEN THE BUOYANCY TUBE OR KEEL PRESSURE REACHES 4 PSI 0 275BAR...

Page 6: ...y tube floor and transom floor fixation buckles Lace the high pressure floor to the fabric flap at the bow 5 16 BOAT ASSEMBLY Assemble the boat on a smooth clean surface IF THE BOAT IS STORED AT A TEM...

Page 7: ...6 16 THERE ARE TWO OTHER TYPES OF FLOOR OPTIONS FOR THIS BOAT Roll up floor Rigid floor...

Page 8: ...240 mbar 3 4 PSI INFLATING THE HIGH PRESSURE FLOOR Inflate the high pressure floor after having placed the buoyancy tube in the above configuration Screw the cap after inflation NOTICE A slight loss o...

Page 9: ...ving bottle filling bench as per standard regulations applicable to diving bottles INFLATING THE BOAT USING THE COMPRESSED AIR DIVING BOTTLE Remove the compressed air cylinder from it s sheath near th...

Page 10: ...ide the inflatable compartments will both decrease to 120mb Consequently the boat must be topped up in order to recover pressure loss due to the difference in temperature between the surrounding air a...

Page 11: ...SSURE MUST BE REDUCED BY LETTING AIR OUT THROUGH THE INFLATION VALVES Buoyancy tube inflation valve A Remove the cap Release some air by lightly pushing down on the diaphragm Screw on the cap A High p...

Page 12: ...transom Repeat the operation until all sand and residues are removed from under the floor Whilst the buoyancy tube is partially inflated rinse the boat with fresh water remove the sand and clean stai...

Page 13: ...ng the lateral tightening cords making sure no accessories are sticking out Fig 4 STORING AN INFLATED BOAT AFTER USE To store the inflated boat The boat must be stowed slightly under inflated Open the...

Page 14: ...C ERB 310 NOTICE Pressure reducer adaptor comprises A Clamp A clamp DIN fitting adaptor one meter hose plus C7 IC valve adaptor Item 4 C7 IC Valve Adaptor Item 2 Adaptor A Clamp 5 8 th Din Item 3 High...

Page 15: ...item 5 as shown Make sure all components are clamped securely to prevent any loss of air during inflation Note The above image is used to illustrate a bottle fitted with A Clamp connection item 1 and...

Page 16: ...inflating otherwise the air will escape through the open valve once the air line is removed NOTICE Ensure that the inflation hose is inserted into the inflation valve and not the pressure relief valve...

Page 17: ...t then proceed to the next boat chamber insert the hose into the inflation valve as described above and proceed with inflation as described above Inflate all chambers including the keel in the same wa...

Page 18: ...4 A5 Illustrations Warning labels on the overpressure valve A6 ANHANG Technische Daten A2 A3 Beschreibung A4 A5 Illustrationen Warnschilder auf dem berdruckventil A6 ALLEGATO Caratteristiche tecniche...

Page 19: ...60 ft 5 3 m 0 75 ft 2 6 m 0 38 ft 15 CAPACIT CAPACITY KAPAZIT T CAPACIT CAPACIDAD ISO 4 child Maximum Kg 530 lb 1170 Kg 32 5 lb 71 6 2 quille plancher H2P 2 keel H2P floor 2 Kiel H2P Boden 2 chiglia...

Page 20: ...re see Technical Specifications Die zul ssige Nutzlast wurde gem ISO Normen berechnet Fahren mit oder nahe der zul ssigen Nutzlast ist nur empfehlenswert in ruhigem Wasser und mit reduzierter Geschwin...

Page 21: ...A4 DESCRIPTION BESCHREIBUNG DESCRIZIONE DESCRIPCION...

Page 22: ...Chiglia gonfiabile Quilla hinchable 12 Valve de surpression plancher H2P H2P O P valve berdruckventil H2P Luftboden Valvola di sovrappressione pagliolato H2P V lvula de sobrepresi n del suelo de alta...

Page 23: ...WARNING ACHTUNG ATTENZIONE ATENCI N AVANT TOUT GONFLAGE TER IMPERATIVEMENT LES BOUCHONS DES VALVES DE SURPRESSION BEFORE ANY INFLATION IT IS IMPERATIVE TO REMOVE THE O P VALVE CAPS VOR DEM AUFPUMPEN D...

Page 24: ...aussmann boulevard Haussmann 75009 75009 75009 75009 PARIS PARIS PARIS PARIS Z Z Z ZE2055 E2055 E2055 E20554 4 4 4 Janvier 2013 Janvier 2013 Janvier 2013 Janvier 2013 ZODIAC ZODIAC ZODIAC ZODIAC MILPR...

Reviews: