background image

It must be positioned after the heating and the filter. 
This must be 

the last fitting before the inlet.

The cell must be horizontal : The water input and output will be pointed
downwards.
Water can circulate in both directions.

For the gluing : the pipe unions are in moulded ABS polymer. 
They can be glued to the PVC pipes using a suitable PVC glue.
First of all clean the surfaces to be glued with a solvent and then glue.
Hold in position for at least 30 seconds.

If you choose to install the cell with a bypass routing, we recommend
that you use a non-return valve and not a manual valve between 
the CLEARWATER® and the inlet.

Important : 

> The water pressure in the cell must not exceed 2 bars. 
> The water temperature must not exceed 40°. 
> If you choose to install shut-off valves, stop the pump then the
CLEARWATER® system before handling the valves. No current must reach
the electrodes when the valves are closed because this can damage 
the cell. Make sure that the valves are open again before re-starting 
the pump and the CLEARWATER® system.

Fix the control box to a wall within 1.5 m from the cell and 1.2 m above
the ground, respecting safety regulations in terms of the distance from 
the pool (this must be at least 3 metres from the edge of the pool). 

If the control box is installed on a pillar, it must be placed on a flat 
and watertight panel at least 24 cm wide and 44 cm high.

Do not enclose the control box in an outer shell.

Do not install it above a source of heat.

It is preferable, but not essential, to place it in a shady area, sheltered
from the rain and direct sunlight.

Connect the power cable to the electrode terminals. 
Blue with blue and black with black.

Make sure that the connections are firmly attached.

Connect the electric cable from the CLEARWATER® electrolyzer’s control
panel to the clock in the switch cabinet that controls the pump
(servo-system from the electrolyzer to the pump).

Wait 24 hours to allow the PVC glue to
set perfectly on the cell’s connections.

15/LM2

Installation of the cell

Installing the control box

How to connect 

the control box to the cell

How to connect 

the control box to the pump

Electric control panel with clock

Pump

Summary of Contents for ClearWater LM2

Page 1: ...instructions carefully before installing and using it c o n t e n t s How does your CLEARWATER system work 13 The controls on your CLEARWATER system 13 Indicators and buttons 13 Installation Installat...

Page 2: ...to right maximum Press it once more and it goes back to the minimum G Super chlorination Used for rapidly increasing the chlorine in the swimming pool on a one off basis To do this leave the filter p...

Page 3: ...rsal cycle is 5 8 hours C Super chlorination Indicator lit up this is indicating that the super chlorination function has been selected It will go out as soon as the super chlorination process has fin...

Page 4: ...efore re starting the pump and the CLEARWATER system Fix the control box to a wall within 1 5 m from the cell and 1 2 m above the ground respecting safety regulations in terms of the distance from the...

Page 5: ...at your chlorinator is operating at its optimum the water balance must be regularly checked and maintained Salinity 4 kg of salt per m3 pH 7 2 to 7 6 Chlorine stabiliser 40 to 75 g per m3 TAC total al...

Page 6: ...linity value measured at least 24 hours afterwards is back down to between 8 and 12 French It is preferable for correct operation that the TH be no higher than 30 Fr 300 ppm To soften the water use th...

Page 7: ...salt in the water Check the TAC Check the level of chlorine stabiliser Backwash We recommend that you set the production rate of your electrolyzer to minimum when carrying out a backwash of the filte...

Page 8: ...enough time for the calcium scale to dissolve When the electrodes have been cleaned remove the solution N B This cleaning solution can be purchased from your specialist swimming pool dealer To make it...

Page 9: ...ue sensor is not connected The unit has been stopped Or the power supply has been cut or a fuse has blown SOLUTIONS Set the pH between 7 2 7 6 Check that the electrodes are clean Check the stabiliser...

Page 10: ...and concern for quality has been used in the construction of our equipment It is subjected to numerous quality controls Our models are regularly updated and improved to make the most of technological...

Reviews: