/ 10
2
ASSEMBLY PROCEDURE
We recommend that you follow the specific order of the assembly procedure. Proceed step by step
and refer to the corresponding pages.
PROCEDURE
PAGE
SECTION
1. inventory the elements composing your boat,
2
CHECK ON UNPACKING
and learn how to recognise them
I - IV
DESCRIPTION
2. activate valves in inflating position
6
INFLATION SYSTEM
3. slightly inflate the main buoyancy tube
7
INFLATION
4.
CADET RU 200 - RU 240 :
Insert the wooden slats in
their pockets
CADET RU 260
:
install the rolling floor
CADET SOLID
: assemble the floorboard
3 - 5
ASSEMBLY
5. Install the seat (except
CADET RU 200
)
9
ASSEMBLY OF
EQUIPMENT
6. finish inflation of the boat to the correct pressure
7 - 8
INFLATION / PRESSURE
7. Install the oars
9
ASSEMBLY OF
EQUIPMENT
CHECK ON UNPACKING
CAUTION
DO NOT USE A SHARP TOOL
The pack must contain: 1 buoyancy tube +
Cadet Roll up
Cadet Solid
C200RU C240RU C260RU
C260S
C285S
C310S
C340S
Floorboard
S (1)
S (1)
R (1)
PF (1)
PF (1)
PF (1)
PF (1)
inflatable keel
1
1
1
1
Stringer
2
2
2
2
Repair kit
1
1
1
1
1
1
1
Owner’s manual (2)
1
1
1
1
1
1
1
Equipement standard
Removable wooden seat
1
1
1
1
1
1
Carry bag
1
1
1
1
1
1
1
Reinforced aluminium oar
2
2
2
2
2
2
2
Foot-pump
1
1
1
1
1
1
1
(1) S = Slats R = Rolling floor
PF = Marine Plywood Floor
(2) 2 volumes
You can equip your boat with many optional accessories (transportation wheels, boarding ladder,
lifting rings etc.). Ask your dealer to advise you.
NOTICE :
IF YOU WISH TO ADD LIFTING RINGS, YOU MUST FIX THEM ON THE
BUOYANCY TUBE, NEVER ON THE FLOOR