background image

4

4.

Place the swing barrier turnstile according to the sizes and positions as shown in the €gure before 
installation and €xing. 

For  the  outlets  of  the  concealed  cables,  please  refer  the  below  diagram  indicating  the  mounting 
holes. The input voltage for this swing barrier turnstile is AC100V-120V/200V-240V and its master 
and slave are connected by an 8-core cable (signal) and a 2-core cable (power). When installing the 
swing barrier turnstile, the user only needs to connect it to the corresponding ports. Note that the 
PVC conduits are laid 100mm under the ground, with the height of the exposed part not exceeding 
100mm. In addition, the conduit outlet is bent back to prevent the ingress of water into the conduit. 

5.

SBTL9000 series installation holes and cabling positions is shown in Figure 4-3: 

 A

Air Switch

Power

24V and network
communication line

Figure 4-3

100 142

1184

780

900

1080

100

273

990

M12

Concrete

Anchor

Tether Cable

Power Line

Network Cable

φ

25mm PVC pipe

Summary of Contents for SBTL9000 Series

Page 1: ...llation Guide SBTL9000 Series Version 1 0 Due to regular upgrades of systems and products ZKTeco could not guarantee exact consistency between the actual product and the written information in this ma...

Page 2: ...any failures caused by long time operations 4 1 1 Installation Requirements The installation position of the swing barrier turnstile depends on its size A distance of 100mm between the swing barrier t...

Page 3: ...separately to easily distinguish strong and weak power Please invite professional personnel to complete the wiring The device must be connected to the ground 4 Thread the connection wire of the devic...

Page 4: ...e centre of the stand and the edge of the chassis base on the ground according to the sizes as shown on the Figure 4 1 1 2 3 Drill the holes with 14 and embed M12 anchor screws or expansion screws As...

Page 5: ...able power When installing the swing barrier turnstile the user only needs to connect it to the corresponding ports Note that the PVC conduits are laid 100mm under the ground with the height of the ex...

Page 6: ...erly If everything works ne you can tighten the screws and x the device If an exception occurs please contact your vendor 6 It is recommended that a warning line be marked on the ground after installi...

Page 7: ...DI4 DI3 DI2 DI1 COM SW1 SW2 SW3 SW4 1 3 5 6 4 2 J10 J11 J9 J6 H2 LED LED LED WD0 WD1 GLED BEEP 12V GND 12V GND 485 485 GND GND 24V GND K1 K1 CL 485 485 BEEP GLED WD1 12V WD0 TFT 19 LCD 5V IR2 IR1 IR3...

Page 8: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com...

Reviews:

Related manuals for SBTL9000 Series