OP1000 series User Manual
2.
Electrical test before installation
Steps of the test:
1
)
Connect the machine with a temporary test cable with input power AC 100 ~ 240V adaptive
(
Note: must be grounded
).
2
)
Turn on the built-in air switch of the brake and wait for 10 seconds to let the brake completes the
self-check procedure.
3
)
Make sure the brake is working properly and check the LED indicator. If all goes well, you can
start the civil installation program. In case of any abnormality, please contact your seller.
3.
Electrical and civil installation
3.1 Equipment installation condition and position
Equipment installation conditions
The ground base must be concrete to ensure the expansion screws are firmly fixed. If you do not have
this condition, please consult construction or decoration professionals about creating the stable
condition of firmly fixed brake machines, such as piling, laying steel plate, etc.
Equipment installation location
According to the chassis space ratio, determine the installation location. For details, please refer to
Figures 3-1 and 3-2.
Decision on the installation plan and composition of a single or multiple intelligent
management channels
There must be a distance of 100mm between the chassis and the wall for opening the top cover of
the machine to perform maintenance and adjustment. The master and slave devices of OP1000
model can form a single channel or dual channels, as shown in Figures 3-1 and 3-2.