FBL6000 Pro series installation guide 1

1 Material preparation

1.

Tools:

A measuring tape, an adjustable wrench, an impact drill and a small screwdriver (included

in the package).

2.

Material:

Fireproof PVC and insulation tube (diameter ≥25mm), standard three-core power

extension wire, M12 expansion screw (included in the package).

3.

Thread the wires through the insulation tube before laying them underground.

4.

Power wire and signal wire should be kept separately to avoid interference between strong and

weak power. It is recommended that the wiring is to be done by a professional. And the device

must be connected to the ground.

Below is the reference to FBL6000 Pro cabling.

Figure 1-1

Summary of Contents for FBL6000 Pro Series

Page 1: ...Pro series Applicable Model s FBL1000 Pro series FBL1200 Pro series FBL2000 Pro series FBL2200 Pro series FBL4000 Pro series FBL4200 Pro series FBL5000 Pro series FBL5200 Pro series FBL6000 Pro series...

Page 2: ...dard three core power extension wire M12 expansion screw included in the package 3 Thread the wires through the insulation tube before laying them underground 4 Power wire and signal wire should be ke...

Page 3: ...evice Note that a ground cable must be connected 2 Wait 30 seconds till the wing gate completes the self test procedure 3 Start the air switch inside the wing gate to check whether the wing gate funct...

Page 4: ...e location of device installation Decide the installation location based on the space needed as illustrated in Figure 3 1A and Figure 3 1B Figure 3 1A Single Passage Wing Gate Figure 3 1B Dual Passage...

Page 5: ...ding to installation hole positions see Figure 3 2 for installation hole positions The unit of the figures in the drawings is mm Figure 3 2 e Apply screw glue to the outer surface and threads of the e...

Page 6: ...Pro series installation guide 5 Figure 3 3 5 Card Swiping Warning Lines It is recommended that a warning line is set to prompt users to swipe cards outside the warning lines as shown in Figure 3 4 Fig...

Page 7: ...swipe Left swipe Right prohibit Left prohibit Right free Left free Right prohibit Two way prohibit 2 Opening speed Low speed Medium speed default High speed 3 Closing speed Low speed Medium speed defa...

Page 8: ...Audio alarm only default Disable the alarm function 11 Set fire signal Enable default Disable 12 Exchange voice of door opening Yes No default 13 Speed compensation of master machine Compensation val...

Page 9: ...8 FBL6000 Pro series installation guide 5 Wiring Diagram Below is the wiring diagram Figure 5 1...

Page 10: ...es installation guide 9 Copyright 2019 ZKTECO CO LTD All rights reserved ZK Building Wuhe Road Gangtou Bantian Buji Town Longgang District Shenzhen China 518129 Tel 86 755 89602345 Fax 86 755 89602394...

Reviews:

Related manuals for FBL6000 Pro Series