4 / 4
P/N 501-2094ZE-1-04 (EN) • REV 04 • ISS 18OCT12
D 1073-1
Page 1: ...ire Security All rights reserved 1 4 P N 501 2094ZE 1 04 EN REV 04 ISS 18OCT12 D 1073 1 ZP787 3 Addressable Outdoor Manual Call Point Installation Sheet 1 2 1 2 3 4 P IN P _ IN P O UT P _ O UT 2 1 5 3 4 5 3 2 1 4 ...
Page 2: ...ged transparent MCP protection cover Transparent MCP protection cover seal A red LED on the front of the ZP787 3 displays its status Off normal Flashing active Figures Figure 1 ZP787 3 Figure 2 Wiring diagram 1 Loop IN 2 Loop IN 3 Loop OUT 4 Loop OUT 5 Shield Figure 3 ZP787 3 installation 1 Front housing assembly 2 Backbox Figure 4 ZP787 3 removal Figure 5 Test reset and glass or resettable elemen...
Page 3: ...d two at the bottom 2 Insert a screwdriver into the slot as shown in Figure 4 and then twist the screwdriver to separate the housing from the backbox Maintenance Figure 5 item 1 illustrates how to perform a test and reset for the device Use the supplied test key to perform routine testing without breaking the glass element Insert the key to simulate breaking the glass element remove the key to res...
Page 4: ...4 4 P N 501 2094ZE 1 04 EN REV 04 ISS 18OCT12 D 1073 1 ...