36
36
CHAPTER 6
CLEANING AND MAINTENANCE
MAINTENANCE AND CONTROL
Regular controls
Before commencing any operation with the Face Hunter, the following controls must be
executed in this order:
- Visual inspection of the mechanical components.
- Functional check of the electronic components.
- Functional check of the mechanical components.
- Visual inspection for damages or foreign bodies.
If after inspection defects are detected, the Face Hunter may not be used. The device must be shut
down and secured against unauthorised access. For trouble shooting please contact our
Zirkonzahn Support: Tel. +39 0474 066 630, [email protected]
Monthly
-
%JGEMVJGſZKPIUETGYUQHVJGNCVGTCNINCUURCPGU
- Clean glass panes of cameras and projector.
Bimonthly
Visual inspection of cables and electric contacts.
If required
4GRNCEGVJGDCVVGTKGUKPVJGƀCUJWPKV
Disconnect the device from power supply
During any maintenance and cleaning works, the Face Hunter must be disconnected from
power supply by unplugging the power plug.
Summary of Contents for Face Hunter
Page 1: ...Face Hunter operator s and maintenance manual...
Page 3: ...03 03...
Page 6: ...06 06...
Page 7: ...07 07...
Page 10: ...10 10...
Page 18: ...18 18 CHAPTER SAFETY AND RESIDUAL RISKS...
Page 19: ...19 19 CHAPTER 2 COMPONENTS COMPONENTS...
Page 26: ...4 3 6 5 2 1 26 26 CHAPTER 4 INSTALLATION FIRST START UP...
Page 28: ...28 28 CHAPTER 4 INSTALLATION FIRST START UP Backside Face Hunter On Off Mains plug...
Page 31: ...2 1 4 3 5 31 31 CHAPTER 4 INSTALLATION FIRST START UP...