5
www.zippity-outdoor.com
STEP 3: SECURING THE FRONT FRAME
STEP 3.2
STEP 3.1
1.
Slide the holes in the right frame (D) one by one over the slats until the right frame is in an L-shape relative to the
front frame.
2.
Drive a 1” screw (F) into the single pre-drilled hole in the right frame.
3.
Drive two 2.5” screws (G) into the two pre-drilled holes in the right frame.
1.
Take the front frame (E) and position it in an L-shape relative to the left frame as shown below.
2.
Drive two 2.5” screws (G) into the pre-drilled holes in the side of the left frame.
1
3
2
Routed
holes
must
face up
G
F
D
1
2
Ensure holes are facing up
E
G