
WWW.
ZIPPITY
-OUTDOOR.COM
9
ASSEMBLY
INSTRUCTIONS
ZP19024
9” diameter
36” deep
Hammer drill will be needed for this step
STEP 8:
SQUARE
AND SECURE POSTS
Square the unit in the space where you plan to install your shower. The diagonal distance
between your posts must be equal for your unit to be square.
STEP 8.1
Surface Mount install:
Mark the hole locations
for all 4 Surface Mounts, and use (16) ¼” x 3”
concrete wedge anchors (NOT INCLUDED),
or similar sized lag screws (NOT INCLUDED) if
mounting on wood, to secure the surface mount.
STEP 8.2A
Post Extension install:
Mark the post
locations and temporarily set the unit aside.
Dig (4) 9” diameter, 36” deep holes at the
post locations. Then lower the unit into the
ground, and fill the holes with concrete (NOT
INCLUDED). Use support blocks to hold the
unit while the concrete cures.
STEP 8.2B
y
x
Note:
If your concrete is not level, insert
galvanized steel washers under the lower
side of the Surface Mount until it is level.
Then, secure with wedge anchors.