STEP ONE (Cont ’d)
5
Slide the base moulding up the post as illustrated.
1
3
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
STEP T WO
1
2
Install Pipe
Using a sledge hammer, drive the pipe into the ground until
the bottom of the plastic gear is just above the ground. This is
the maximum depth. If your ground is too hard, just drive the
pipe until it feels secure in the ground. In some ground
conditions, this could be as little as 18”.
Please check level in both directions at about 6” intervals as
you pound the pipe into the ground. Usually, after the pipe is
about 18” into the ground, the trajectory of the pipe is
established and you cannot pull the pipe back into level.
Once the pipe has been installed into the ground,
measure the distance from the ground to the middle
of the top donut. You will need this measurement for
future installation of screws in step 3.
3
3
Classica Vinyl Mailbox Post Instruction
Hammer
5lb Sledgehammer
BETTER
10lb Sledgehammer
BEST
5
±21 5/8 in