background image

STEP ONE (Cont ’d)

5

Slide the base moulding up the post as illustrated.

1

3

DO-IT-YOURSELF 

FRIENDLY PRODUCTS

Zippity

STEP T WO

1

2

Install Pipe

Using a sledge hammer, drive the pipe into the ground until

the bottom of the plastic gear is just above the ground. This is

the maximum depth. If your ground is too hard, just drive the

pipe until it feels secure in the ground. In some ground

conditions, this could be as little as 18”.

Please check level in both directions at about 6” intervals as

you pound the pipe into the ground. Usually, after the pipe is

about 18” into the ground, the trajectory of the pipe is

established and you cannot pull the pipe back into level. 

Once the pipe has been installed into the ground, 

measure the distance from the ground to the middle

of the top donut. You will need this measurement for

future installation of screws in step 3.

3

3

Classica Vinyl Mailbox Post Instruction

Hammer

5lb Sledgehammer

BETTER

10lb Sledgehammer

BEST

5

±21 5/8 in

Reviews: