806834 v1.02 07.21 G5 Online install instructions and user guide
11
• Check if there is adequate space to install all of the components.
• Note Not all fittings are supplied with the appliance kit. Isolation valves are not
supplied.
• Check the mains water pressure is within min / max requirements (see page
• Check the water quality to determine if extra filtration will be required.
• Note This product must be fitted to a wholesome water supply.
• Check the Command Centre rating plate and ensure correct power is available.
• Check the under counter cupboard floor supporting the Command Centre is adequate
for its total weight, when full of water.
Before commissioning
• Check the system has been installed correctly.
• Check all plumbing fittings for water tightness.
• Ensure the outlet and vent pipes are positioned to drain correctly.
• Ensure there is adequate ventilation.
• Check all tubes and pipes from the Command Centre to the tap have a constant rise and
there are no sags or kinks in the hoses.
Commissioning
• Flush the supply line before connecting.
• Turn on the water and check for leaks.
• Flush the filter(s).
• Activate / enable the booster (if fitted).
• Adjust the carbonation flow valve (sparkling models).
• Calibrate the safety sensor for boiling models (optional).
• Where applicable, programme the Command Centre to suit the customer’s
requirements.
Installation checklist
!
UV
!
!
UV
!
!
UV
!
!
UV
!