
06
Installation instructions & user manual
804545UK V2.03 Aug 2018 - Zip Hydroboil
Technical support
Tel: 0345 6 005 005 Email: [email protected] www.zipwater.co.uk
Installation instructions
Before You Begin
• Locate the paper mounting-hole template packed with the Hydroboil. (Also see
pages 13, 14).
• Read the installation and operating instructions completely.
• Decide whether to install with concealed or exposed plumbing connections.
• Concealed connections are preferred for superior appearance.
Step 1 – Positioning
• Position the Hydroboil so the spout will drain onto a draining board or drip tray.
• Position the base of the tap nozzle to be not less than 280mm (nominally
360mm) above the draining board (height should be increased only if essential
for filling larger vessels).
• Provide clearance for service access of not less than 150mm top, 65
mm left, 20mm right.
• Mark corner positions for the Hydroboil on the wall in order to position the
paper mounting-hole template.
Step 2 – Fastening
• Position mounting-hole template on wall and drill holes where shown.
• Drill holes for water inlet and vent outlet if rear access is intended.
• Install plumbing and wiring and prepare pipe ends as shown adjacent & on
page 8.
• Remove cover fastening screws from Hydroboil and lift off cover.
• Screw Hydroboil chassis to the wall using screws or bolts suited to the wall,
(supplied).
• Fasteners must be able to support the product weight when full, (see
Technical specification, page 5).
45mm
Elbow
Inlet clearance
Cold
inlet
Vent
outlet
Inlet
position
Vent
position
3 to 7.5 litre models
Strain relief bush (cable gland)
Terminal block
Escutcheon
Tap nut
Tap
Concealed
access