![Zip AQUAPOINT III Eco Installation Instructions & User Manual Download Page 9](http://html1.mh-extra.com/html/zip/aquapoint-iii-eco/aquapoint-iii-eco_installation-instructions-and-user-manual_3924046009.webp)
9
INSTALLATION INSTRUCTIONS & USER MANUAL
210001 V1.01 AUG 2017 - ZIP AP3/30e-100e
TECHNICAL SUPPORT
TEL: 0345 6 005 005 EMAIL: SERVICE@ZIPINDUSTRIES .CO.UK
WWW.ZIPWATER.CO.UK
Cold inlet set - connections
Fig.1
Cold Mains In
Balanced Cold Take Off
Cold Supply To Cylinder
Internal Check Valve
Expansion Vessel Take Off
Discharge To Tundish
Expansion Relief Valve
Pressure Reducing Valve
(inc. Line Strainer)
• Cold inlet assembly comprising pressure reducing valve with integral line strainer and
expansion relief valve with check valve, expansion vessel take off and balanced cold
water take off. (See Fig.1)
• Expansion vessel and wall fixing bracket.
• Zip Aquapoint III Eco hot water cylinder wall locating bracket (supplied with product).
• Tundish.
Water cylinder wall locating bracket is supplied with the cylinder.
All other parts are supplied as part of the AQ105 (AP3/30e, AP3/50e) or AQ108 (AP3/80e,
AP3/100e) kit.
COMPONENTS SUPPLIED WITH THE UNIT FOR SITE FITTING