Zinco Fallnet SR Installation And Instruction Manual Download Page 8

8

Manufacturer: 

ZinCo GmbH ∙ Lise-Meitner-Strasse 2 ∙ 72622 Nuertingen ∙ Germany 
Phone +49 (0) 7022 6003-0 
Email: [email protected] ∙ www.zinco-greenroof.com

Testing institute:

 

DEKRA EXAM GmbH ∙ Dinnendahlstrasse 9 ∙ 44809 Bochum ∙ Germany 
Notified body N.B. 0158

 

Inspection Chart Fallnet

®

 SR

 

 

Overview of documentation and plan of inspection works.

Building:

.....................................................................................................................................................................................

 

..................................................................................................................................................................................................

Inspection

Date

Address Authorised company/

person

Comments: reason for inspection, defects

identified, repair work carried out

Date of next 

inspection 

Signature

1

st

 year

2

nd

 year

3

rd

 year

4

th

 year

5

th

 year

6

th

 year

7

th

 year

8

th

 year

9

th

 year

10

th

 year 

Commission an overall inspection to be carried out by the manufacturer

.

 Inspected serial number(s): ..........................................................................................................................................................

Summary of Contents for Fallnet SR

Page 1: ...Fallnet SR Installation and Instruction Manual and Inspection...

Page 2: ...d min 110 kg m 3 The grid must fully cover the base plate and the vertical locking tabs must engage the adjacent elements Installation Manual Page 3 Instruction Manual Page 5 Details on Manufacturer P...

Page 3: ...at the bulk material to be used as the load on the Fallnet SR extends at least 50 cm beyond all four edges of the grid elements Important The Fallnet SR must always be in direct contact with the load...

Page 4: ...installation documentation is available in PDF from the manufacturer On completion of installation copies of the document are to be given to the client and are to be retained on the property for subs...

Page 5: ...nly be used for a roof pitch of maximum 5 it must only be installed on a suitable subsurface i e either on a filter sheet multi course build up or on a protection mat or layer single course build up s...

Page 6: ...fall is prevented or a swinging fall does not result in impact Prior to use an emergency plan must be available in which all possible occupational emer gency situations are addressed At the request of...

Page 7: ...carried out by suitably qualified personnel who have been authorised by the manufacturer and are to be recorded on the rear side of this inspection chart The following inspection works are required vi...

Page 8: ...Inspection Chart Fallnet SR Overview of documentation and plan of inspection works Building Inspection Date Address Authorised company person Comments reason for inspection defects identified repair...

Reviews: