Zinco Fallnet SR Installation And Instruction Manual Download Page 2

2

4.  Positioning the grid and the Anchor Point

5.  Connecting the four grids and check the position

List of Contents

Procedure

6.  Applying the required load (min. 110 kg/m²)

3. The grid must fully cover the base plate and the vertical locking 

tabs must engage the adjacent elements

Installation Manual  

Page  3

Instruction Manual  

Page  5

Details on Manufacturer   Page 6
Inspection Chart  

Page 7 

1.  Measuring the position of the anchor point

2.  Place the marked grid over the anchor point and click into place

 

>110 kg/m²

Summary of Contents for Fallnet SR

Page 1: ...Fallnet SR Installation and Instruction Manual and Inspection...

Page 2: ...d min 110 kg m 3 The grid must fully cover the base plate and the vertical locking tabs must engage the adjacent elements Installation Manual Page 3 Instruction Manual Page 5 Details on Manufacturer P...

Page 3: ...at the bulk material to be used as the load on the Fallnet SR extends at least 50 cm beyond all four edges of the grid elements Important The Fallnet SR must always be in direct contact with the load...

Page 4: ...installation documentation is available in PDF from the manufacturer On completion of installation copies of the document are to be given to the client and are to be retained on the property for subs...

Page 5: ...nly be used for a roof pitch of maximum 5 it must only be installed on a suitable subsurface i e either on a filter sheet multi course build up or on a protection mat or layer single course build up s...

Page 6: ...fall is prevented or a swinging fall does not result in impact Prior to use an emergency plan must be available in which all possible occupational emer gency situations are addressed At the request of...

Page 7: ...carried out by suitably qualified personnel who have been authorised by the manufacturer and are to be recorded on the rear side of this inspection chart The following inspection works are required vi...

Page 8: ...Inspection Chart Fallnet SR Overview of documentation and plan of inspection works Building Inspection Date Address Authorised company person Comments reason for inspection defects identified repair...