
2
4. Positioning the grid and the Anchor Point
5. Connecting the four grids and check the position
List of Contents
Procedure
6. Applying the required load (min. 110 kg/m²)
3. The grid must fully cover the base plate and the vertical locking
tabs must engage the adjacent elements
Installation Manual
Page 3
Instruction Manual
Page 5
Details on Manufacturer Page 6
Inspection Chart
Page 7
1. Measuring the position of the anchor point
2. Place the marked grid over the anchor point and click into place
>110 kg/m²