
S
u
b
je
ct
t
o
t
e
ch
n
ic
a
l
a
lte
ra
tio
n
s
a
n
d
p
ri
n
ti
n
g
e
rr
o
rs
•
F
ir
st
e
d
it
io
n
0
3
/2
0
0
8
;
R
e
vi
se
d
0
7
/2
0
2
3
ZinCo GmbH
Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany
Phone +49 7022 6003-0
[email protected] ∙ www.zinco-greenroof.com
Product Identification Card in accordance with EN 365
Product:
Fallnet
®
SB 200-Rail
Manufacturer:
ZinCo GmbH, Lise-Meitner-Strasse 2, 72622 Nürtingen, Germany
Planned Construction:
Serial Number(s):
Year of manufacture:
Date of installation:
Control Card
Fallnet
®
SB 200-Rail
Fallnet
®
SB 200 Rail in combination with a solar installation (photovoltaic
or solar thermal) or a railing system and a correspondingly high load of
suitable bulk material (e.g. ZinCo system soil, Zincolit
®
, gravel 16/32 mm
or slabs in a chippings bed) represents an anchoring device in accordance
with DIN EN 795:2012 types D and E for fall protection on flat roofs with
a roof pitch of up to 5°.
A fixing point (the so-called runner) may only be used by one person (up
to 100 kg) at a time, and this person should be wearing personal protective
equipment (PPE, e.g. ZinCo-PPE-Set) in accordance with EN 363. The
safety harness, in accordance with EN 361, can only be used in conjunction
with tested and approved components.
Regular Inspections
Regular checks are required to ensure that the fixing device is functioning
properly. These must be carried out at least every 12 months or immediately
after the anchor device has been used, e.g. due to a fall, or if there are
indications of limited functionality. The inspection work must be initiated
by the building owner/property owner and must be carried out by
competent persons authorised by the manufacturer and documented on
the reverse side of this inspection card.
The following inspections are necessary:
- Visual check of damage to and position of the fixing device
- Check of all connections and gaps (maximum 5 mm)
- Manual inspection of the tensile load on the fixing point
- Sufficient coverage, check of the necessary superimposed load
- Readability of the product label
Note:
If there are any doubts regarding the sound condition or the safe usage
of the device, then any further use is prohibited. The builder must be
informed immediately. The latter is required to take appropriate
measures to restore the safe usability of the facility.
After 10 years, the manufacturer must undertake a full inspection of the
Fallnet
®
SB 200-Rail system.
Page 8 of 9