Zinco Fallnet SB 200-Rail Installation Instructions Manual Download Page 8

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Product Identification Card in accordance with EN 365 

Product: 

Fallnet

®

 SB 200-Rail 

Manufacturer: 

ZinCo GmbH, Lise-Meitner-Strasse 2, 72622 Nürtingen, Germany 

Planned Construction: 

 

Serial Number(s): 

 

 

Year of manufacture: 

 

Date of installation: 

 

 

Control Card 
Fallnet

®

 SB 200-Rail 

Fallnet

®

 SB 200 Rail in combination with a solar installation (photovoltaic 

or solar thermal) or a railing system and a correspondingly high load of 
suitable bulk material (e.g. ZinCo system soil, Zincolit

®

, gravel 16/32 mm 

or slabs in a chippings bed) represents an anchoring device in accordance 
with DIN EN 795:2012 types D and E for fall protection on flat roofs with 
a roof pitch of up to 5°. 
A fixing point (the so-called runner) may only be used by one person (up 
to 100 kg) at a time, and this person should be wearing personal protective 
equipment  (PPE,  e.g.  ZinCo-PPE-Set)  in  accordance  with  EN  363.  The 
safety harness, in accordance with EN 361, can only be used in conjunction 
with tested and approved components. 

 

 

Regular Inspections 

 

Regular checks are required to ensure that the fixing device is functioning  
properly. These must be carried out at least every 12 months or immediately 
after the anchor device has been used, e.g. due to a fall, or if there are 
indications of limited functionality. The inspection work must be initiated 
by  the  building  owner/property  owner  and  must  be  carried  out  by  
competent persons authorised by the manufacturer and documented on 
the reverse side of this inspection card. 

 
 

The following inspections are necessary: 

 

- Visual check of damage to and position of the fixing device 

 

- Check of all connections and gaps (maximum 5 mm) 

 

- Manual inspection of the tensile load on the fixing point 

 

- Sufficient coverage, check of the necessary superimposed load 

 

- Readability of the product label 

 

Note: 

 

If there are any doubts regarding the sound condition or the safe usage 
of  the  device,  then  any  further  use  is  prohibited.  The  builder  must  be 
informed  immediately.  The  latter  is  required  to  take  appropriate 
measures to restore the safe usability of the facility. 

 

 

After 10 years, the manufacturer must undertake a full inspection of the 
Fallnet

®

 SB 200-Rail system. 

Page 8 of 9 

Summary of Contents for Fallnet SB 200-Rail

Page 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Page 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Page 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Page 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Page 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Page 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Page 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Page 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Page 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...

Reviews: