Zinco Fallnet SB 200-Rail Installation Instructions Manual Download Page 6

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Attention: 

 

After a fall event the fall protection system Fallnet

®

 SB 200-Rail must be  

removed from service immediately. It can only be released for use again 
after

 testing and repair by a knowledgeable person. 

  

 
The  product  SB  200-Rail  must  only  be  used  for  the  purpose  and  
application  as  described.  The  manufacturer  accepts  liability  for  the  
product within the framework of applicable statutory requirements.

 

 
The manufacturer accepts no liability for any other deviating use of  the 
product.  Furthermore,  the  manufacturer  accepts  no  liability  where  the 
Installation  Instructions  and  the  User  Instructions  have  been  insufficiently 
adhered  to.  We  wish  to  state  explicitly  that,  regardless  of  product  liability, 
ZinCo  shall  only  assume  liability  for  the  consultancy  process  where  
installation has been carried out in line with ZinCo site planning. Installation 
without site planning carried out by ZinCo is at your own risk.

 

Where the fixing device Fallnet

®

 

SB 200-Rail is sold in another country, 

the technician/user must receive a copy of the Installation/User Instructions 
and the Control Card in the language of that country.

 

 
 
4. Label 

 

Every runner is equipped with an identification label. The label contains 
the following information:  

Manufacturer: ZinCo GmbH  

Type: Fallnet

®

 SB 200-Rail 

Standard: Fall Protection System   Year of manufacture:  
acc. To EN 795:2012,  

Date of manufacture (year)  

Type D+E    

Serial-No.: …………..  

max. 1 person: max. number of users  

  

 

The notified body nominated for certification

 

 

Note that the Instruction Manual is to be observed

 

 
Fall protection equipment only to be used with a 
fall absorber

 

 

 
5. Details of manufacturer and testing institute  

 

Manufacturer:   
ZinCo GmbH 
Lise-Meitner-Straße 2 
72622 Nuertingen, Germany  
Phone +49 (0) 7022 9060-770 
E-Mail: [email protected] 
www.zinco-greenroof.com 

 

Testing institute: 
DEKRA EXAM GmbH 
Dinnendahlstraße 9 
44809 Bochum, Germany  
 
 
 
 
 

User Instructions 
Fallnet

®

 SB 200-Rail 

Page 6 of 9 

Summary of Contents for Fallnet SB 200-Rail

Page 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Page 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Page 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Page 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Page 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Page 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Page 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Page 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Page 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...

Reviews: