17
10.3 Installing the energy supply
The integrated pin assignment supplies the
product and control system with power.
1
1
Signal transmission
10.3.1 Mounting the pin assignment
pin Function
Explanation
8|H
2|B
1|A
7|G
1|A
-
-
2|B
-
-
3|C
+ 24 V DC actuator
Actuator supply voltage
4|D
C/Q
IO-Link communication
5|E
FE
Functional ground
6|F
-
-
7|G
GND
8|H
+ 24 V DC sensor
Supply voltage of sensor
INSTALLATION AND OPERATING INSTRUCTIONS:
HRC-07
DDOC01015 / a
EN / 2022-07-20
Zimmer GmbH • Im Salmenkopf 5 •
77866 Rheinau, Germany •
+49 7844 9138 0 • www.zimmer-group.com