15
10.3 Installing the energy supply
NOTICE
The cables that are used by Zimmer GmbH feature a minimum bending radius of 10 x the outer diameter.
This bending radius must not be undershot!
►
Freely suspended cables must be secured to prevent excessive motion loads or pinching.
►
The contacts of the energy supply must be dry, clean and undamaged at all times.
Ö
Damage to the contacts can result in malfunction of the product.
CAUTION
Non-compliance may result in material damage.
Incorrect pin assignment can lead to malfunction or destruction of the product.
►
Be absolutely certain to ensure correct pin assignment.
►
Connect the power supply cable to the
control system of the product.
10.4 Pin assignment GEP2000IO-05/GEP2000IO-45
pin Color
Function
Explanation
1
2
4
3
5
M8 5-pin plug
1
Brown
+ 24 V DC
+ 24 V DC supply voltage
2
White
MoveToBase
command
Digital input 24 V voltage level
3
Blue
GND
0 V DC supply voltage
4
Black
MoveToWork
command
Digital input 24 V voltage level
5
Gray
Analog output
0 to 10 V DC output
►
Connect the product to the voltage supply.
►
Ensure the proper voltage supply.
•
A voltage supply between pin 1 and pin 3 is necessary for operation.
Ö
A jaw movement is triggered by a voltage level between PIN 2 or PIN 4.
NOTICE
In order to prevent damage to the product, the resistance between the analog output and GND must be at least
10 kΩ.
INSTALLATION AND OPERATING INSTRUCTIONS:
GEP2000
DDOC01113 / c
EN / 2022-11-16
Zimmer GmbH • Im Salmenkopf 5 •
77866 Rheinau, Germany •
+49 7844 9138 0 • www.zimmer-group.com