background image

Z8 Encore!

®

 Z8F642 MCU

Evaluation Kit Quick Start Guide

Supported Host Environments

QS002802-0703

Page 2

Supported Host Environments

Win98 Second Edition, WinNT 4.0 Service Pack 6, Win2000 Service Pack 3, WinXP 
Service Pack 1

PentiumII/233MHz processor or higher up to Pentium IV, 2.8 GHz

96MB RAM or more

25MB hard disk space or more

Super VGA video adapter

CD-ROM drive for software installation

One or more RS-232 communication ports

Setting up the Evaluation Board

The PC communicates with the Encore!

®

 Z8F642 Evaluation board using the serial port 

of the PC. A Z8 Encore! Smart Cable converts the RS-232 signals into the 3.3V bidirec-
tional open-drain signal needed to communicate with the on-chip debugger of the eZ8.

Always use a grounding strap to prevent damage resulting from electro-
static discharge (ESD).

1. Connect the serial port of the PC to the Z8 Encore!

®

 Smart Cable DB-9 female 

connector.

2. Connect the Z8 Encore!

®

 Smart Cable to the Z8F642 MCU evaluation board pin 

header P2.

3. Connect the power supply to the evaluation board at J1, then to an electrical outlet 

(Figure 1).

Connecting the Power Supply

There are two methods of connecting the universal power supply: the plug configurations 
method or the Hewlett Packard power cord method.

Plug Configuration Method

The universal power supply kit features four different plug configurations in one box 
and the power supply itself in another. The power supply ships with a slide-out plate 
that must be removed to insert the location-specific plug configurations.

1. Remove the slide-out plate.

2. Select the plug configuration specific to the power requirements of your locale 

and insert it into the slot that remains after removing the slide-out plate.

Caution:

Downloaded from 

Elcodis.com

 

electronic components distributor

 

Summary of Contents for Z8 Encore!

Page 1: ...to Z8 Encore evaluation board DB9 to six pin male Universal power supply Software on CD ROM ZDS II Encore IDE with ANSI C Compiler Sample code Acrobat Reader install program Document browser Document...

Page 2: ...ro static discharge ESD 1 Connect the serial port of the PC to the Z8 Encore Smart Cable DB 9 female connector 2 Connect the Z8 Encore Smart Cable to the Z8F642 MCU evaluation board pin header P2 3 Co...

Page 3: ...Hewlett Packard socket on the other end to the Hewlett Packard power cord receptacle at the plug end of the power supply 2 Plug the power supply into an electrical outlet Installing the ZDS II Z8 Enc...

Page 4: ...tallation The License Agreement appears 3 Select Yes to accept the agreement and proceed with the installation 4 After selecting Yes the Choose Destination Location screen appears Follow the direction...

Page 5: ...sion number Getting Started Using ZDS II Perform the following procedure to open an existing project 1 Connect the Evaluation board to the host PC s serial communications port using the Smart Cable 2...

Page 6: ...rectory 6 Select the Z8F64xx_ledBlink folder and then the src folder to access the project file containing ledBlink pro Figure 5 Figure 5 src Folder 7 Select the ledblink pro file and click open The i...

Page 7: ...k on the Rebuild All icon to build the project Wait for the build to complete 9 Click on the Reset icon to connect and download the code to the Evaluation board 10 Click on Go to start the program The...

Page 8: ...703 Page 8 Figure 7 ZDS II Active Screen 11 Press the test push button to change the sequence of the LEDs to blink in the opposite direction The three LEDs begin blinking in sequence If the LEDs do no...

Page 9: ...ed to suggest possible uses and may be superseded ZiLOG INC DOES NOT ASSUME LIABILITY FOR OR PROVIDE A REPRESENTATION OF ACCURACY OF THE INFORMATION DEVICES OR TECHNOLOGY DESCRIBED IN THIS DOCUMENT Zi...

Reviews: