4. Installation  

4.1 Mounting 

  Assemble the device on a clean and stable base. Do not distort during assembly! Use the appropriate mounting 

devices for proper installation of the unit!  

  Do not mount equipment on vibrating base! 

  Use the appropriate fixing equipment. The plastic washers must be installed between the screw heads and the 

housing for models with mounting holes on the inside of the housing! 

  Install the device away from transport routes. However, ensure however that the device is still easily accessible! 

  Depending on the housing model cut off necessary cable inlets respectively to the cable diameter. Or alternative use 

cable inlet for cable glands. Metal sheet housings are supplied with stoppers. Any cable ducts openings not used 
must be sealed! 

  Protect the device from direct exposure to sunlight! 

  The device is designed for vertical installation (cable inlet down). A horizontal or reclined installation is only 

permissible after consultation with the manufacturer. 

 

Be sure to observe proper heat dissipation (

)

 Technical data, “heat dissipation”) 

 
4.2 Minimum space requirement  

In order to ensure sufficient ventilation of the device, clearance on all sides of at 
least 50 mm has to be maintained to the housing walls, switch cabinet doors, 
wiring ducts, etc. The same clearance applies to the installation of several 
devices next to each other (

)

 illustration). 

When installing several devices on top of each other, the danger of reciprocal 
heating exists. This layout is only then permissible when the air suctioned from 
the upper unit does not become warmer than the permissible ambient 
temperature (

)

 Technical data). I.e., a correspondingly larger clearance or 

thermal shielding is required.  
 
 

4.3 Outdoor installation (PSE-6/14V or PAE10E-M in empty case IP 54) 

Outdoor installation in IP 54 is possible up to -20° C, if device is not switched off. 

 

4.4 Temperature influences during commissioning 

To prevent functional faults, no condensing humidity must be allowed to enter the controller. The controller should 
therefore be stored at room temperature! 

 

4.5 Systems with current-operated circuit-breaker

 

Owing to possible leakage currents occurring when the device is switched on, it is advisable to use time-delay current-
operated circuit-breakers. This prevents false triggering. 

 

4.6 Potential of control voltage connections  

As a result of the ex factory connection between a "GND" terminal and the "PE" connection, the control voltage 
connections are, for safety reasons, applied to the protective-conductor potential. If, in exceptional cases, disconnection 
of the potential is necessary, this connection can be removed. 

{

 

If this connection is removed, it must be ensured that the maximum external voltage at the control 
voltage connections does not exceed 

20 V

 (between the "GND" terminals and the "PE" protective 

conductor). 

{

 

An insulated power cable must be used for the sensor cable. 

min. 50 mm

Summary of Contents for PAE10E-M

Page 1: ...V Part No 303585 Electronic speed controller for variable voltage 1 motors Manufacturer ZIEHL ABEGG AG Heinz Ziehl Stra e D 74653 K nzelsau Phone 49 0 7940 16 0 Fax 49 0 7940 16 200 Internet http www...

Page 2: ...commissioning 6 4 5 Systems with current operated circuit breaker 6 4 6 Potential of control voltage connections 6 4 7 Interference Emissions Cable installation 7 4 8 Electrical installation 7 5 Basic...

Page 3: ...ration If used in intensive animal environments any malfunctions in the air supply must be detected as soon as possible to prevent the development of a life threatening situation for the animals The d...

Page 4: ...nsation Interference emission EN 61000 6 3 Harmonics current EN 61000 3 2 Interference immunity EN 61000 6 2 The units comply with EN 61000 3 2 for a professional unit Up to a maximum current of 4 amp...

Page 5: ...x speed potentiometer speed limiter and cos adjustment Setting range from 100 down to setting n min This adjustment has to be made with full load condition i e when radial fans are used all dampers mu...

Page 6: ...to the installation of several devices next to each other illustration When installing several devices on top of each other the danger of reciprocal heating exists This layout is only then permissible...

Page 7: ...be longer than 30 m Screened control cables must be used when the cable length is longer than 20 m When using a screened cable the screen must be connected to the protective conductor at one end i e o...

Page 8: ...nal circuit resistor 499 0 25 W between the terminals E and GND 5 3 Voltage supply for external equipment There is an integrated power supply for external equipment A selection between 15 V and 24 V i...

Page 9: ...stabilisation must be switched off when loading the voltage supply for external units 15 V 24 V section 5 3 Voltage supply or for running from a mains transformer It is not meaningful to operate with...

Page 10: ...upted KT00008G 15 07 2004 PE L N Netz oder geregelte Spannung line or controlled voltage Reseau ou tension variable Nat eller reglerad spanning 1 60V 250V 50 60Hz 1 2 4 6 12 11 24 23 Option ZB ZK 2S K...

Page 11: ...s PAE10E M PSE 6 14V Date 0618 R TBL95_35_GB 0618 Part No 00158612 GB 11 Switch off the main supply before removing the cover Vor ffnen des Deckels Ger t spannungsfrei schalten 7 2 Dimension sheet PAE...

Reviews: