background image

CoreView Videoscope
System: Set-Up

Step 1- Unpack CoreView 2.7 videoscope and other 
components

Step 2- Plug connector from #1 CoreView 2.7 

videoscope into #2 Video Controller (align red index 

marks on connectors)

www.zibracorp.com   1-800-758-8773   [email protected]

3

Lift from circled area to access lower storage 

Summary of Contents for CoreView 2.7

Page 1: ...2 7 Articulating Videoscope User Manual v03 5 18 16 www zibracorp com 1 800 758 8773 sales zibracorp com 1...

Page 2: ...ter 800 mm shaft length flexible scope sheath multi durometer Nylon w SS braid 2 way articulating scope tip 100B up down 62 000 pixel CMOS image 90 degree HFOV field of view F4 0 3 50 mm DOF depth of...

Page 3: ...ew 2 7 videoscope and other components Step 2 Plug connector from 1 CoreView 2 7 videoscope into 2 Video Controller align red index marks on connectors www zibracorp com 1 800 758 8773 sales zibracorp...

Page 4: ...videoscope into ACMI port on front panel of LED light source www zibracorp com 1 800 758 8773 sales zibracorp com 4 Brightness control Step 4 Plug in connector from 2 Video Controller power supply ali...

Page 5: ...Step 5 Plug in HDMI Cable to back of 2 Video Controller connect to HDMI monitor 19 or smaller monitor recommended Step 6 Turn power on to 2 Video Controller 3 LED Light Source and HDMI monitor Your s...

Page 6: ...e articulation controller will hold it s position until re adjusted Please be aware that the CoreView 2 7 videoscope has a distal rigid tip length of 8 mm and a bending section length of 15 mm do not...

Page 7: ...ontact with acids and strong solvents should be avoided as serious damage can result Videoscope Cleaning Tips Fingerprints and debris on optical surfaces can seriously degrade borescope performance Ta...

Page 8: ...n RMA number prior to returning your equipment for evaluation thank you Zibra Corporation 640 American Legion Hwy Westport MA 02790 Office 1 800 758 8773 Email sales zibracorp com Web www zibracorp co...

Reviews: