background image

7

ASSEMBLY GUIDE

4. Assembly

4.2 Assembly Step by Step

M3.5X12

Step 11

Mount the Remote Control to the Table top as illustrated above.  

Please refer to 

Torque Guide

.

Step 12

Perform Zero Setting.

5. Operating Instructions

Please read below instructions carefully before operating the system.

Up

Down

5.1 Zero Setting:

When using the height adjustable frame for the first time lower the desk to the lowest height as explained below before proceeding . 

• 

Press ▼ button and keep pressing the button until the desktop has reached the lowest position (programmed desktop position). 

• 

Press ▼ button again and hold. After about five seconds, the desktop will slowly move further down until it reaches the lowest 

• 

possible desktop position.

• 

Release ▼ button. The electric height adjustable frame is now ready for use.

Zero setting position is approximate 5mm lower than original starting height position.

Setting Button

S

Memory Position 1

1

Memory Position 3

3

Memory Position 2

2

Summary of Contents for e-ZGO 20 Series

Page 1: ...1 ASSEMBLY GUIDE Rev 01 2021 04 27 ENGLISH e ZGO Series 20 21...

Page 2: ...ge the displayed desktop position cm or inch 5 5 Saving a desktop position 5 6 Adjusting the desktop to a saved position 5 7 Reset control unit to factory settings 5 8 Changing the desktop height disp...

Page 3: ...face or it will not be steady Never exceed the maximum load capacity on the adjustable frame Please check the load capacity in Section 7 Specification The control unit is only used for specified linea...

Page 4: ...on End Pipe 2 Pcs Gear Connection 1Pcs Connection Cable 1 Pcs Left Leg 1 Pcs Leg with Motor 1Pcs Power Cable 1 Pcs Feet 2 Pcs Frame 1 Pcs Remote Control 1 Pcs M6x12 4 Pcs M6x8 4 Pcs ST 4 8x16 6 Pcs M3...

Page 5: ...ue 6nm M10 Screw s max torque 6nm Tapping screws is hand tightening only 4 2 Assembly Step by Step M6x12 Step 3 Mount the End Pipe to leg as illustrated above M6X8 M6X25 Step 2 Assemble the Leg and Fr...

Page 6: ...ve Step 5 Loosen the Gear Connection rotating nut as illustrated above ST 4 2X16 Step 9 Mount the Control Unit as illustrated above ST 4 8x16 Step 7 Mount the Frame and End Pipe to the Table top as il...

Page 7: ...the desk to the lowest height as explained below before proceeding Press button and keep pressing the button until the desktop has reached the lowest position programmed desktop position Press button...

Page 8: ...frame to any position in the lower half to deactivate the container stop Move the frame to any position in the upper half to deactivate the shelf stop Do so by pressing the or button until you reach t...

Page 9: ...ress the up or down button or to choose the desired setting 0 means G sensor close 1 means G sensor least sensi tive 8 means G sensor most sensitive Press the S button to finish the setup 6 6 Changing...

Page 10: ...remote control is now unlocked 6 9 Reset control unit to factory settings Follow the instructions below to use a configured control unit on another identical electric height adjustable frame or to re...

Page 11: ...f movement is only possible downwards Replace Control Unit Replace the Remote Control Replace the Leg Legs only operating in one direction Possible Cause Remedy Power Cable is not connected Remote Con...

Page 12: ...again E06 Main power start did not succeed lower than 20V Replace the main power supply or check the main power cable E07 Protect when the main power supply is running lower than 20V Power up again E0...

Page 13: ...duce load E40 Controller drop line in series Check the cable E41 Error in the series signal Check the cable or replace the controller E42 Memory error Replacing the controller E43 Disable sensor error...

Reviews: