Zeversolar Zeverlution S Setup Manual Download Page 4

 

Power_Management_1_Phase_Inv_Rev1_20160426 

 

1

 

Single Phase Inverter – Power Management & EEG Set-Up 

1.1

 

Introduction 

This standard operating procedure (SOP) details the steps that are required to successfully activate 
and deactivate the Power Management & EEG settings from the front LCD of a Zeversolar single phase 

inverter. Typically the Power Management settings on the inverter is required when using a ComBox, 

ZeverCom or ZeverManager whilst the EEG setting is for use in Germany. 

Please note for firmware 

versions that are older than the versions listed in Table 2 no Power Management or EEG Set-Up is 
necessary.

 

 

1.2

 

Assumed Knowledge 

This guide assumes the following: 

 

A Zeversolar single phase inverter has been installed; 

 

Either  a  Zevercom  or  Zevermanager  has  been  installed  for  Active  Power  Management 

(optional); 

 

The installation manuals for both the inverter, Zevercom and/or Zevermanager has been read 

and fully understood. 

 

1.3

 

IMPORTANT – CHECK GRID CODE SETTING DURING COMMISSIONING! 

The grid code, power management and EEG settings should be checked during the commissioning of 

a PV plant. It is essential to ensure that the correct grid code/safety setting has been selected for the 

relevant region. Each Zeversolar inverter is set to a default grid code which is based on the serial 

number suffix that can be found on the label affixed to the inverter and its packaging, see Figure 1 
below. 

 

Figure 1 - Serial Number with UK Suffix 

Inverters  shipped  to  Europe  have  three  distinct  suffixes  and  as  such  the  default  grid  code  is  set 
accordingly, please see Table 1. 

 

S/N Suffix  Default Grid Code 

DE 

VDE-AR-N-4105 

UK 

G83/2 or G59/3 

NL 

NEN 50438 

Table 1 - Default Grid Code Settings 

Therefore it is 

necessary

 to check the serial number suffix and ensure that the correct grid code is 

set. For example, an inverter being installed in the UK may have the DE suffix, in this case the inverter 
grid code should be changed from the “VDE-AR-N-4105” grid code to the relevant UK grid code “G83/2 

or G59/3.” Please contact Zeversolar to receive a copy of the Grid Code set-up guide. 

 

 

Summary of Contents for Zeverlution S

Page 1: ...Zeverlution S Evershine TL Eversol TL Power Management EEG Setup Guide...

Page 2: ...r Power Management EEG Setup Guide Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 22...

Page 3: ...3 IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING 3 1 4 When is Power Management EEG Required 4 1 4 1 Power Management 4 1 4 2 EEG 70 4 1 5 Hardware Requirements 5 1 6 Software Requirements 5...

Page 4: ...IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING The grid code power management and EEG settings should be checked during the commissioning of a PV plant It is essential to ensure that the corr...

Page 5: ...r of according to a defined characteristic curve which is a function of U Un Active Power Limitation The PV plant will limit the active power based on either the rated inverter AC output rated DC arra...

Page 6: ...activating Activating 1 7 1 Checking Firmware Version It is necessary to ensure that the inverter has the appropriate firmware version For older firmware versions it is not necessary to deactivate or...

Page 7: ...F is displayed To confirm the setting simply release the control button and wait until the Normal screen is displayed 4 To activate the Power Management press the control button until ActiPowFun ON is...

Page 8: ...ent_1_Phase_Inv_Rev1_20160426 7 1 8 Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 2...

Reviews: