![Zeus Appollo Z10I1K User Manual Download Page 33](http://html.mh-extra.com/html/zeus-appollo/z10i1k/z10i1k_user-manual_932319033.webp)
31
(ill. 13)
Insert the stripped cable end until the insulation comes up
against the crimp insert. Completely close the crimping
pliers.
(ill. 14)
Visually check the crimp.
(ill. 15)
Insert the crimped-on contact into the insulator of the male
or female coupler until it clicks into place. Pull gently on
the lead to check that the metal part is correctly engaged.
(ill. 16)
Insert the appropriate end of the test pin into the male or
female coupler as far as it will go. If the contact is correctly
located, the white mark on the test pin must still be visible.
(ill. 17)
Screw up the cable gland hand-tight with the tools PV-MS
or tighten the cable gland with the tools PV-WZ-AD/GWD
and PV-SSE-AD4.
In both cases: The tightening torque must be appropriate
for the solar cables used. Typical values are between 2,5
Nm and 3 Nm.
(ill. 18)
Plug the parts of the cable coupler together until they click
in place. Check that they have engaged properly by pulling
on the cable coupler.