Please take a few moments to check all pack contents listed on page 1 of the
Assembly Instructions.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752 555 Option 1 or email:
[email protected]
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded/Cordless Drill, Pozidrive Bit/Screwdriver, 3mm Drill Bit.
Economy Potting Table is now complete.
1.
Fix Shelf Assembly (A) to Side Frames (B) as shown in Fig 1 using 4no 35mm
screws. Ensure that shelf support rails face inwards.
2.
Attach 2no Side Frame Bracings (C) to Side Frames using 4no 35mm screws
(2no per bracing), as shown in Fig 2.
3.
Place Worktop Assembly (D) on to the framework ensuring open edge of Worktop
Assembly is flush with front face of side frames and screw down into legs using
4no 50mm screws (See Figs 3a & 3b).
4.
Position 2no Lateral Bracings (E) to Side Panels and Worktop Assembly ensuring
mitre cuts are correctly orientated and attach using 4no 35mm screws (2 per
bracing). See Fig 4.
5.
Attach Fascia Board (F) to Side Panels using 4no 35mm screws (2no per end),
ensuring top of Fascia Board is flush with top of Worktop Assembly as shown in
Fig 5a & 5b.
6.
Position Shelf Upstand (G) to rear of Shelf Assembly and fix to rear legs of Side
Frames using 4no 35mm screws (2no per end - See Fig 6).