zero
HOME AUTOMATION
Z06 - SWING GATE
PG6
It is very important that these dimen
-
sions are respected! Only this way
can be as- sured the correct functio
-
ning and durability of the operators!
It is also very important to have a
levelled ground/terrain!
1. Insert the motor into the foundation case
and fixit with nuts and washers supplied.
2. Insert the ball in the pin located on the box
and fit the gate anchorage lever (L1).
3. Put the connection lever(L2) between the le
-
vers (L3) and (L1) and block it with screws and
washers supplied.
4. Insert the cover and fasten it with the screws
provided position
5. Position the gate wing and the lever (L1) so
that they are perfectly aligned and fasten them
by welding or similar.