Installa
tion - Moun
ting the Duc
t C
o
v
e
r
MOUNTING THE DUCT COVER
1. Open the front panel. Fig.1
NOTE!
Open the front panel while holding it by its
external sides, as shown in Fig.1, and keep at a su-
itable distance to avoid impacting it.
2. Remove the Decorative Mesh Filters.
3. Loosen the two screws inside the hood that fasten
the canopy. Fig.2
4. Slide the top cover off by lifting it. Fig.3
5.
Adjust the width of the duct cover support bracket
so that it fi ts inside the top of the chimney and
observing the distance shown in
Fig. 4
6.
Secure duct cover bracket to top of wall just below
the ceiling using (2) screws provided. See
Fig.5
7.
Place correct size ducting for your installation (not
supplied) to the hood and secure to the blower
collar with aluminum duct tape.
Fig. 6
8.
Insert top duct cover into bottom duct cover. Seat
the duct covers correctly on the hood.
9.
Extend top duct cover up and secure to the duct
cover bracket using (2) screws. See
Fig. 7
- 3 -
Summary of Contents for Z1C-00TI
Page 7: ... 7 ...
Page 8: ...3FA0167 ...