15
Trapeze Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Range Hood
1. Determine the location for mounting
the hood. Mark centerlines front
to back and left to right of hood
placement. Place supplied paper
template on ceiling and center
marked center lines with template
center lines. Mark mounting holes
for ceiling bracket and telescopic
rod couplers.
2. Cut out hole in ceiling for the duct
work and electrical wiring passage.
3. Add and secure wood blockings
(minimum 2x4 studs) between
ceiling joists for ceiling bracket and
telescopic rod couplers if needed.
FIG. B.
4. Center, mark and fasten ceiling
bracket onto ceiling using (4) M4*38
screws and (4) washers. Make sure
the word “FRONT” displayed on the
ceiling bracket is facing the front of
the hood where the controls will be
located. FIG. C.
Add Blockings
Tabs
Tabs
Ceiling Bracket
CL
Mounting
Holes
Marking
for Coupler
CL
Ceiling
Set screw mounting
hole
Electrical wiring
passage
FRONT
5. Attach telescopic rod couplers to marked locations on ceiling using (1) #6*2” wood screw for
each coupler. Make sure the set screw mounting hole is toward the bottom of the coupler during
mounting. FIG. C.
6. Prepare and position electrical wiring and duct work through ceiling bracket.
FIG. B
FIG. C