10
www.zephyronline.com
Installation –
PBD-1300A
Dual Blower Ducting
1. Disconnect blower plug and white and black
power cables.
2. Remove (4) screws from interior of hood body
attaching single blower plate to top of hood
body. Remove single blower and single blower
plate.
3. Remove (4) screws attaching single blower to
single blower plate.
4. Attach single blower to dual blower plate by (4)
previously removed screws from step 3.
This range hood is equipped standard with a single blower vertical duct option. To convert from single blower
vertical ducting to dual blower vertical ducting please following the instructions below.
5. Position dual blower inside hood body as
shown. Be sure to tuck dual blower plate into
blower plate tabs. Secure dual blower by (4)
screws previously removed from step 2.
6. Attach 10” round blower collar to top of hood
body by (4) M4 x 8 screws. Connect blower
wire extension cable to new blower and connect
plugs from each blower to female plugs behind
switch panel.
Summary of Contents for Roma Pro Wall ZRP-E36AS
Page 2: ...www zephyronline com...
Page 23: ...www zephyronline com...