20
PRB24C01CBSG Use, Care, and Installation Guide
B E V E R A G E
C O O L E R
S I N G L E Z O N E
P R E S R V ™
Installation Instructions
Ź
To prevent damaging the door or door gasket, make sure the door is open at least 90-degrees
when pulling shelves out of the rail compartment.
Ź
The door opens to a maximum of 115 degrees with a door stop on the bottom hinge preventing the
door from opening further.
Installing the Wooden Roll-Out Shelves
1. Open the door completely.
2. Line up the shelf notches with the rail posts on both the right and left sides.
3. Push the shelf down and then push it all the way inwards until the shelf fully rests inside of the unit
and you are able to close the door.
4. The shelf should glide smoothly back and forth. If it does not, you may need to remove it and start
over.
TIP:
To prevent damaging the door gasket, make sure to open the door fully before pulling the shelves
out of their track.
Removing the Wooden Roll-Out Shelves
1. Open the door completely.
2. Remove all of the contents loaded on the shelf, if applicable.
3. Line up the shelf notches with the rail posts as indicated below. This will require you to hold on to
both rails as you move the shelf to line up the posts with the notches on both sides of the shelf.
4. Evenly lift the shelf up and then pull the shelf out.
Rail Posts
Notch
Rail
Rail