www.zephyronline.com
Installa
tion - Moun
ting the R
ange Hood
2. Secure the top support frame to
the duct cover ceiling bracket by
using the (4 type B) screws. Fig. 10
3. Position hole template on the ceiling
paying attention that the arrow is po-
sitioned on the same side as the range
hood controls.
- Make 4 holes in the ceiling and drive
in (3 type C) screws without completely
tightening them. Pay attention not to in-
sert the screw into the hole marked with
an X on the hole template. Fig. 11
4. Lift the hood assembly to the cei-
ling and align the top support fra-
me and ceiling bracket with the (3)
screws previously installed in the
ceiling.
Rotate assembly slightly clockwise to
lock in place.
Drive in the fourth screw (type C) and
tighten the remaining 3 screws
to secure the structure in place.
Fig.11
- 16 -