14
www.zephyronline.com
1
2
1
Installation –
Horizontal Ducting Preparation
12.
Position blower inside insert body as shown
by:
1)
Rest the bottom horizontal ducting
bracket on the two support clips located on
the interior back wall of the insert.
2)
Pivot top
horizontal ducting bracket to meet captive nuts
on interior back wall.
13.
Secure blower to captive nuts on interior back
wall of insert with (8) 3/16” x 3/8” screws,
(4) screws for each bracket. Seal any gaps
around the knock-out plate by using certifi ed
aluminum duct tape. Plug in blower molex
plug.
Horizontal ducting preparation is now
Horizontal ducting preparation is now
complete. Refer to Page 10, Step 5 to
complete. Refer to Page 10, Step 5 to
complete installation.
complete installation.
10. (Rectangular Ducting)
From inside the insert,
push 3-1/4” x 10” rectangular adaptor through
the back knock-out and secure to interior back
wall of insert with (8) M4 x 6mm screws.
10. (Round Ducting)
From inside the insert, push
8” round adaptor through the back knock-out
and secure to interior back wall of insert with
(4) M4 x 6mm screws.
11.
Secure (2) horizontal ducting blower brackets
to blower as shown above by using the (4)
3/16” x 3/8” screws previously removed from
Page 12, Step 6; (2) screws for each bracket.
Summary of Contents for AK9234AS
Page 2: ...www zephyronline com ...