23
Tempest I Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
PBD-1200A Dual Blower Installation
4. Install dual blower plate from
PBD-1200A kit into hood body.
Attach by (4) screws previously
removed from step 3.
5. Install previously removed blower
onto one side of dual blower plate
and attach by (4) previously
removed screws from step 2.
6. Install blower from PBD-1200A
kit onto other side of dual blower
plate by (4) 3/16 x 3/8 screws.
Summary of Contents for AK7000CS
Page 2: ...2 Tempest I Use Care and Installation Guide TEMPEST I UNDER CABINET PRO...
Page 41: ...41 Tempest I Use Care and Installation Guide ZEPHYRONLINE COM Notes...
Page 42: ...42 Tempest I Use Care and Installation Guide TEMPEST I UNDER CABINET PRO Notes...
Page 46: ...2 Tempest I Guide d utilisation d entretien et d installation TEMPEST I SOUS ARMOIRE PRO...
Page 85: ...41 Tempest I Guide d utilisation d entretien et d installation ZEPHYRONLINE COM Remarques...