Keep about 1 meter distance between zelsius

®

 

C5-CMF and electromagnetic sources of inter-
ference like switch cabinets, motors or pumps. 
Keep  about  0.2  m  distance  to  power  cables. 
Keep min. 3 cm free mounting space around 
the device.

Notes ball valves

 

Mount ball valves up- and downstream of the 
meter.

 

Mount a ball valve with bore M10x1 for direct 
sensors in the supply. This is required for the 
installation of the supply sensor.

 

For symmetrical temperature sensor installa-
tion, mount an identical ball valve in the return. 

Mounting heating / cooling energy meter

 

Flush the system thoroughly before installing 
the heating energy meter.

 

Close valves and release pressure.

 

Screw out the overflow cap (2) or the existing 
measuring capsule.

 

Check the seal face and thread on the measur-
ing capsule and the EAS for damage.

 

Remove  the  old  profile  seal,  clean  the  seal 
face and insert the new one (3) into the EAS 
(4) with the flat side up.

 

Attention: insert only one profile seal! The O-
ring on the meter’s filter must be fitted into the 
groove.  Use  only  new  and  flawless  sealing 
material.

 

Use only new and flawless sealing material.

 

Remove  the  protective  cap  (1)  from  the  new 
measuring capsule (5) and then screw into the 
EAS (4).

 

Tighten measuring capsule up to the metallic 
stop with a hook wrench (for example: accord-
ing to DIN 1810 A, 68-75 mm).

 

Turn heat calculator to desired reading position.

Information:

 The best measuring results can be 

achieved by mounting with horizontal diallevel.
Combi-devices are, for example, used in tight 
installation points without room for the calculator 
on the flow sensor or when the calculator is dif-
ficult to read. 

Installing the temperature sensor

 

The installation of the temperature sensors 
should be preferably symmetrical and direct 
installation.

 

Do not remove the return sensor if already 
mounted  in  the  VMU.This  is  also  valid  for  all 
the safety seals which are mounted on the de-
vice as standard.

 

Sensors are colour-coded (red = supply, blue 
= return).

 

The connecting cables may not be buckled, ex-
tended or shortened.

 

The seal at the sensor installation point on the 
measuring capsule may not be damaged.

 

Remove locking screw and seal at the ball 
valve completely, if existing.

Montage DF- Adapter

Summary of Contents for zelsius C5-CMF

Page 1: ...sius C5 CMF Installation and operating manual electronic compact heat meter with coaxial measuring capsule CMF M Bus wM Bus and 3 inputs outputs optional qp 0 6 1 5 2 5 m3 h EnergyMetering All that counts ...

Page 2: ...0 100 Starting flow horizontally ca l h 5 5 7 Pressure loss at qp bar 0 25 bar Temperature range C 10 C θq 90 C Minimum pressure avoiding of cavitation bar 0 3 Measurement accuracy class 3 Connecting interface M60 IST TE1 Nominal pressure PS PN 16 Nominal diameter DN depending on the connecting interface Installation position horizontally or vertically no upside down installation Installation retu...

Page 3: ...onal GmbH Co KG declares that this product with Technical data calculator Temperature range C 0 105 Temperature difference range K 3 80 Display LCD 8 digit additional character Ambient temperature C 5 55 Minimum temperature diffence K 3 Resolution temperature C 0 01 Measurement frequency s adjustable ex works beginning with 2s standard 30s Unit to read the heat consumption Standard MWh optionally ...

Page 4: ...mp cloth only Do not use any scouring or aggressive cleaning agents The device is maintenance free during the service life Repairs can only be made by the manufacturer The most up to date information about this prod uct and of our installation notice can be found at www zenner com Pulse inputs and outputs optional By meters with pulse inputs the pulse value can be called up in the display see the ...

Page 5: ...rm 1434 3 and operates with 2400 baud fixed The two conductors can be connected in any order to the M Bus network colour connection signification brown M Bus 1 M Bus Line 1 white M Bus 2 M Bus Line 2 Dimensions Height compact version H 50 mm Height combiversion H1 H2 H 65 mm Measure X is depending from the used concentric flow meter IST M60 TE1 Connecting sizes Nominal flow qp m h 0 6 1 5 2 5 Nomi...

Page 6: ...pstream of the meter It is important to ensure adequate system pres sure to avoid cavitation To mount the heat computer of the C5 CMF in combi version on the wall the supplied mounting adapter has to be used The review of the ap proval can be identified definitely in the display menu Level 3 ZENNER recommends to use direct temperature measurement and not to use immersion sleeves The measuring caps...

Page 7: ...e fitted into the groove Use only new and flawless sealing material Use only new and flawless sealing material Remove the protective cap 1 from the new measuring capsule 5 and then screw into the EAS 4 Tighten measuring capsule up to the metallic stop with a hook wrench for example accord ing to DIN 1810 A 68 75 mm Turn heat calculator to desired reading position Information The best measuring res...

Page 8: ...display advances and the tem peratures displayed correspond with the actual temperatures see the display overview Wait for the temperature display to be updated 1 2 sec Secure the measuring capsule and the EAS with the enclosed sealing material against un authorised removal Fill in the putting into use report in accordance with PTB Directive TR K9 Load Asymmetric sensor installation for zelsius wi...

Page 9: ...eck sensors 2 Temperature out of measuring range Check sensors 3 Short circuit return sensor Check sensors 4 Interruption return sensor Check sensors 5 Short circuit supply sensor Check sensors 6 Interruption supply sensor Check sensors 7 Battery voltage Exchange device 8 Hardware error Exchange device 9 Hardware error Exchange device 100 Hardware error Exchange device 800 Wireless interface Excha...

Page 10: ...difference from last due date to now Cooling energy difference from last due date to now Heat energy difference from 1 this month to now Cooling energy Segment test End of the battery Error status System Date Maximal Flow Cooling energy difference from 1 this month to now Volume difference from 1 this month to now Due date cooling energy Energy Last due date Date last due date Volume Supply temper...

Page 11: ...r status System Date m System Time Operation hours Primary M Bus address lue Certification model Firmware version wer sioning Function Output 3 Function Output 2 Function Output 1 Opto readout energy Pulse value Input 1 Pulse value Input 2 Pulse value Input 3 Level 4 Legend Press the button briefly S to switch through the display from top to bottom When you have reached the last menu item the devi...

Page 12: ... or other accessories are disposed Therefore please contact the department of your local authority which is responsible for waste disposal Alternatively a waste disposal via ZENNER is possible Your local or municipal authority or the local waste disposal company can give you informa tion relating the collection points for your used equipments Attention Do not dispose of the devices with domestic w...

Reviews: