5. Electrical connection

 

6. Commissioning

 

Gateway with plug-in power supply

 

The gateway starts immediately after insertion / con- 

nection.

 

The gateway passes through several phases during the 

boot process, which are indicated by the LEDs. Please 

observe the following sequence of the four LEDs. LED 

No. 4 signals the connection to the backend.

 

 

This variant is operated with a plug-in power sup-  

ply. The electrical connection can be established by a

 

laymen. Commissioning is performed by inserting the 

power supply unit.

 

ill. 3

 

1.

 

Off

 

Off

 

Off

 

Off

 

Boot process

 

3.

 

Green

 

Off

 

Red

 

Red

 

Gateway with plug-in power supply

 

5.

 

Green

 

Off

 

Off

 

Red

 

Ready for opera-

 

tion - network con-  6.2 

nection

 

Green /

 

Orange

 

Green

 

Red

 

Green

 

Flashes

 

red / 

Off

 

green

 

A.

 

Off

 

Green

 

Flashes

 

red / 

Off

 

green

 

Red

 

Red

 

Explanation of the stages:

 

1.

 

2.

 

3.

 

4.

 

No power supply 

Hardware  initialisation 

Hardware  initialisation

 

Mobile radio connection not active, no connection

 

to LoRa network server (LNS)

 

Mobile radio connection active, no connection to

 

LNS

 

Normal operation (6.2, 6.3)

 

5.

 

6.

 

ill. 4

 

6

 

 

Update via 

6.4 

network

 

Flashes

 

red / 

Green /    Red  Green 

green      Orange

 

Ready for opera- 

tion - network

 

connection 

6.3

 

 

 

Green     Green /    Off 

Green 

Orange

 

 

reserved 

6.1 

 

 

Green     Off 

Off 

Green

 

 

4.

 

Green     Off 

Red 

Red

 

2.

 

Red 

Red 

Off 

Off

 

Phase 

Stage

 

4

 

reserved 

 

 

reserved 

6.5 

 

 