5. Electrical connection
6. Commissioning
Gateway with plug-in power supply
The gateway starts immediately after insertion / con-
nection.
The gateway passes through several phases during the
boot process, which are indicated by the LEDs. Please
observe the following sequence of the four LEDs. LED
No. 4 signals the connection to the backend.
■
This variant is operated with a plug-in power sup-
ply. The electrical connection can be established by a
laymen. Commissioning is performed by inserting the
power supply unit.
ill. 3
1.
Off
Off
Off
Off
Boot process
3.
Green
Off
Red
Red
Gateway with plug-in power supply
5.
Green
Off
Off
Red
Ready for opera-
tion - network con- 6.2
nection
Green /
Orange
Green
Red
Green
Flashes
red /
Off
green
A.
Off
Green
Flashes
red /
Off
green
Red
Red
Explanation of the stages:
1.
2.
3.
4.
No power supply
Hardware initialisation
Hardware initialisation
Mobile radio connection not active, no connection
to LoRa network server (LNS)
Mobile radio connection active, no connection to
LNS
Normal operation (6.2, 6.3)
5.
6.
ill. 4
6
Update via
6.4
network
Flashes
red /
Green / Red Green
green Orange
Ready for opera-
tion - network
connection
6.3
Green Green / Off
Green
Orange
reserved
6.1
Green Off
Off
Green
4.
Green Off
Red
Red
2.
Red
Red
Off
Off
Phase
Stage
1
2
3
4
reserved
reserved
6.5