Page 6 of 12
Zenith Econoboil - Installation & Operating Instructions - 804544NZ - 03.17 v1.00
Installation Procedures
Continued
Step 4 – Tap installation
Thread tape
2. Before installing the tap, ensure enough
thread tape is applied to the thread.
3. Turn the tap fully clockwise to the end stop
and stopped at upright position.
4. Use the spanner to tighten the lock nut an-
ti-clockwise.
1. Fit the cover to the unit and
fi
x with
screws top and bottom.
Lock nut
Installation Procedures
Continued
For a concealed electrical connection, disconnect the pre-fitted flex and
plug cable at the PCB connector and discard. Connect the concealed
power cable through the rear access opening to the green terminal
block on the PCB.
For concealed electrical connection, an isolation switch should be
installed.
Check that the earth is connected through the PCB to the chassis with
an ohm meter.
Warning: Do not connect both options. It is essential that the flex and
plug cable is removed from the PCB if the concealed connection is
used. Otherwise the GPO plug will become live.