Zendure SolarFlow ZDSPVH1200 User Manual Download Page 34

14

Solar Input

To AB1000

To Microinverter

Note:
• It takes a period of time for the system to grid connection, and it takes 

about 20 minutes to synchronize data to Zendure App, so after the 
installation, please wait 20 minutes before going to the APP settings.

• It is recommended that you as much as possible store in the battery 

during the day except for basic power consumption.The way to know the 
basic power consumption as follow:

1.  Calculated the device consumption you always run during the day or 24 

hours a day, such as refrigerators, routers and standby devices.

2. Go to the meter box right before you go to bed, write down your current 

meter reading and the time. As soon as you get up, you write down 
the meter reading and the time. You can calculate your base load from 
consumption and elapsed time. 

3. You can use a measuring socket that you plug between the socket and 

the power consumer. To calculate the base load, you collect the wattage 
consumed from all the devices that are constantly running (including 
standby) and add up the values.

EN

Summary of Contents for SolarFlow ZDSPVH1200

Page 1: ...SolarFlow User Manual Deutsch English support eu zendure com...

Page 2: ......

Page 3: ...ung ge ndert werden Die aktuellste Version finden Sie unter https zendure com pages download center Das SolarFlow System umfasst Smart PVHub und Zusatzakku AB1000 SolarFlow und Mikro Inverter stellen...

Page 4: ...Eingangsgleichspannung 16V Max DC Kurzschlussstrom 14 3A Max Eingangsstrom 2 13A Anzahl der MPPT 2 Ausgang an Mikro Inverter Empfohlene Leistung des Mikro Inverters 400 1200W Nennausgangsleistung 120...

Page 5: ...tsch den oder Verletzungen auftreten 8 Stellen Sie vor Abschluss der Installation sicher dass Solarmodul Kabel und Mikro Inverter Kabel vom heimischen Stromnetz getrennt sind 9 Stellen Sie sicher dass...

Page 6: ...kommt Falls dieses Ger t St rungen des Radio oder Fernsehempfangs verursachen sollte was leicht durch Aus und Einschalten des Ger tes herausgefunden werden kann wird dem Anwender empfohlen die St rung...

Page 7: ...leistung Ihres Mikro Inverters Die Ausgabe an den Mikro Inverter darf nicht h her sein als die Nennleistung Ihres Mikro Inverters Bitte schalten Sie das Ger t aus dr cken und halten Sie die IOT Taste...

Page 8: ...Sekunden gedr ckt halten Taste Zubeh rpaket TOP MC4 Anschluss PV Eingang 1 positive Elektrode MC4 Anschluss PV Eingang 1 negative Elektrode MC4 Anschluss PV Eingang 2 positive Elektrode MC4 Anschluss...

Page 9: ...tet dann gr n AB1000 wieder aufladen AB1000 Anzeige blinkt gr n Verbleibende AB1000 Akkukapazit t Anzeige in Zendure App Zendure App herunterladen und SolarFlow binden Hinweis ber geringe Leistung Anz...

Page 10: ...lation s mtliches Zubeh r und bereiten Sie folgende Werkzeuge vor Werkzeuge sind nicht im Lieferumfang enthalten Philips Schraubendreher Sechskantschl ssel Arbeitshandschuhe Bohrmaschine Markierstift...

Page 11: ...n Abbildung gezeigt ist Trennen Sie die Kabel von Mikro Inverter und heimischem Stromnetz Trennen Sie nur die Kabel des ersten Solarmoduls und des Mikro Inverters Trennen Sie auf die gleiche Weise die...

Page 12: ...Wand das Ger t installiert werden soll Die eine Person h lt Smart PVHub mit beiden H nden an der Wand die andere Person markiert die Positionen der vier Schraubenl cher des PVHub mit einem Marker Boh...

Page 13: ...e Person fixiert den Mikro Inverter mit beiden H nden an der Wand und richtet ihn an den Bohrl chern aus Anschlie end platziert die andere Person die flachen Unterlegschreiben an den Schrauben und ste...

Page 14: ...f einer Seite 3 Schlie en Sie den AB1000 mit dem Akkukable an Smart PVHub an Die Anschl sse des Akkukabels rasten mit einem Klickger usch automatisch ein wenn Sie das Akkukabel richtig angeschlossen h...

Page 15: ...esamte Solareingang 800 W betr gt stellen Sie 200 W zum Mikro Inverter ein und 600W werden an den AB1000 eingespeist Ger t hinzuf gen und auf die neueste Firmware Version aktualisieren Leistung zum Mi...

Page 16: ...Stromverbrauch in Erfahrung 1 Berechnen Sie den Verbrauch der dauerhaft w hrend eines Tages 24 Stunden betriebenen Ger te wozu K hlschr nke Router und Standby Ger te geh ren 2 Gehen Sie direkt vor de...

Page 17: ...ckdose Ziehen Sie zur Trennung der Solarmodule die Kabel der beiden Solarmodule und des Smart PVHub Schalten Sie zur Trennung von AB1000 trennen Sie dann die Kabel von Smart PVHub und AB1000 Ziehen Si...

Page 18: ......

Page 19: ...hbaren Artikel beinhalten Diese Garantie gilt nur f r Kunden die ihre Artikel ber die offizielle Website von Zendure oder einen von Zendure autorisierten Handelsplatz oder Verk ufer erworben haben Uns...

Page 20: ...oder Produkte die eine Batteriezelle enthalten au er die Batteriezelle wurde innerhalb von sieben 7 Tagen nach dem Erwerb Ihres Produkts und nachfolgend mindestens einmal alle sechs 6 Monate von Ihnen...

Page 21: ...version please visit https zendure com pages download center SolarFlow system include Smart PVHub and Add on battery AB1000 SolarFlow and micro inverter constitute a small grid connected PV energy st...

Page 22: ...Voltage 16V Max DC Short Circuit Current 14 3A Max Input Current 2 13A Number of MPPT 2 Output to Microinverter Recommended Microinverter s Power 400 1200W Rated Output Power 1200W Max Microinverter O...

Page 23: ...7 Please install the product according to our user manual to avoid damage to the product or injury to other people 8 Ensure before finishing installation the solar cable the micro inverter canle to h...

Page 24: ...n a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to ra...

Page 25: ...ttery Cable 1 5m 1 Solar Cable Used for solar panels connection 2 Battery Cable Used for AB1000 connection 3 Microinverter Cable Used for microinverter connection 4 Mounting Screws Hooking up PVHub an...

Page 26: ...ease press Iot button 2 seconds to turn on SolarFlowfor the first use Before unplugging a connection please turn off SolarFlow Bottom Aerial Port Battery Port 1 1 2 2 3 3 Button accessory pack TOP MC4...

Page 27: ...e APP and contact customer service PVHub Indicator flashes red AB1000 AB1000 connection connect AB1000 with Smart PVhub via battery cable AB1000 indicator flashes for 2s and then stays lit green AB100...

Page 28: ...n please check all accessories and prepare the following tools tools are not included in the purchase Phillips Screwdriver Hexagon Wrench Work Gloves Electric Drill Marker Pen Tape Measure Tips If you...

Page 29: ...n in following figure Unplug the cables of the microinverter and the home grid Only unplug the cables of the first solar panel and the microinverter The same way to unplug the cables of the second sol...

Page 30: ...fixes the Smart PVHub on the wall with his hands and the other person marks the positions of the four screw holes of the PVHub with a marker Drilling drill four diameter 8mm mounting holes at the fou...

Page 31: ...ng Installing microinverter One person fixes the microinverter with both hands on the wall and align the hole drilling in step 3 then put the flat Washers on the screws at last screw screws with flat...

Page 32: ...e front The arrow on the battery connector and the note on the top of the AB1000 are on one side The arrow on the battery connector and the note on the top of the AB1000 are on one side 3 Connect AB10...

Page 33: ...ate to the latest firmware version Set the power to the microinverter Privacy Policy By using Zendure Products Applications and Services you consent to the Zendure Terms of Use and Privacy Policy whic...

Page 34: ...follow 1 Calculated the device consumption you always run during the day or 24 hours a day such as refrigerators routers and standby devices 2 Go to the meter box right before you go to bed write dow...

Page 35: ...olar panels and Smart PVHub Disconnection of AB1000 Unplug the cables of Smart PVHub and AB1000 Disconnection of microinverter unplug the cables of microinverter and Smart PVHub Unscrew the mounting s...

Page 36: ......

Page 37: ...is only available to customers who purchased their items from Zendure s official website or a marketplace or seller authorized by Zendure Our friendly and responsive support team is happy to assist yo...

Page 38: ...arranty does not apply to any battery cells or products containing a battery cell unless the battery cell has been fully charged by you within seven 7 days after your purchase of the product and at le...

Page 39: ......

Page 40: ...re USA Inc ZENDURE TECHNOLOGY CO LIMITED E mail support eu zendure com Hours Mon Fri 9 00 17 00 Support Contact https zendure de pages contact https eu zendure com pages contact us https zendure com p...

Reviews: