Zemic BM-11-401 Installation Manual Download Page 5

Installation Manual BM-11-401 Mount

 

 

Specifications and dimensions are subject to change without notice and do not constitute any liability whatsoever.

 

Zemic Europe B.V.

 

 

 

T: +31 76 50 39480

 

Nr. 2021.10 Installation Manual BM-11-401 Rev2

 

[email protected] 

Page 5/5

 

 

www.zemiceurope.com

 

Part List

 

Fig. 4

 

Position 

Description 

Quantity 

Base plate 

Spacer plate 

Hexagon bolt 

Washer 

Stub 

Nut (Lower) 

Nut (Upper) 

Washer 

Hexagon socket  head counter sunk bolt 

10 

Top plate 

11 

Lower bearing 

12 

Rocker pin support 

 

13 

Rocker pin 

14 

Earth cable  

15 

Hexagon bolt + washer 

 

Use 

Routine maintenance includes the optical inspection of bolts, plates and force bearing parts, as well as 
the removal of dirt, dust and debris built up near or between the load cell and/or mount in order to let it 
move freely. 

Finally 

A load cell will perform within specifications until the safe load limit or safe side load limit is passed. 
Beyond this point, even for a very short period of time, the load cell will be permanently damaged. The 
load cell may physically break at the ultimate load limit. 

When not working properly remove load cell with care and attach a label with comments relating to the 
problem or mode of failure. Return also a copy of the Certificate of Calibration with the load cell if 
available. 
Don't cut cable at the gland to facilitate removal - please - we cannot test load cells without cables! 

Reviews: