background image

 

 

2. INSTALLATION 

2.1 ACCEPTANCE, UNPACKING AND HANDLING 

Upon receiving your ZEKS air dryer, please inspect the unit closely. If rough handling is detected, please note it on your 
delivery receipt, especially if the dryer will not be uncrated immediately. Obtaining the delivery person's signed agreement 
to any noted damages will facilitate any insurance claims by the customer. 
It is mandatory to always keep the dryer in a vertical position, as indicated by the symbols present on the packaging. For 
handling, use devices having sufficient capacity for the weight of the machine. 
Remove the packaging after having positioned the dryer in the installation site. Dispose the various packaging materials in 
compliance with the relevant rules locally in force. 
If not in use, the dryer can be stored in its packaging in a dust-free and protected site between 32°F (0°C) and 120°F 
(50°C), and a specific humidity not exceeding 90%. Should the stocking time exceed 12 months, please contact your local 
ZEKS authorized distributor. 
Under no circumstances should any person attempt to lift heavy objects without proper lifting equipment (i.e., crane, hoist, 
slings or fork truck). Lifting any unit without proper lifting equipment, may cause serious injury. Use fork lift channels 
where provided. 

2.2 INSTALLATION SITE 

 

 

While preparing a proper site for the installation of the dryer, please take into account the following 
requirements 

ƒ

  The machine must be protected from atmospheric agents and not directly exposed to sun light. 

ƒ

  A seating base that is flat and capable of holding the weight of the machine. 

ƒ

  Ambient temperature complying with the nominal data of the dryer. 

ƒ

  The dryer should be located in a clean area, without forced air draft that can affect the fan control 

system. 

ƒ

  Make sure to leave sufficient clearance (20 inches, 500 mm) around the dryer to allow adequate 

cooling of the machine and for maintenance and/or control operations. 

 

The incoming air must be free of smoke or flammable vapors which could lead to explosion or fire risks. 

2.3 INSTALLATION 

 

 

 

 

 

Before attempting any installation operation, make sure that 

ƒ

 

No parts of the air system are under pressure. 

ƒ

 

No parts of the system are electrically powered. 

ƒ

 

Tubing to be connected to the dryer are free of impurities. 

ƒ

 

All interconnecting piping has been tightened. 

After having verified the points listed above, you can proceed to the installation of the machine. 

1.  Connect the dryer to the compressed air lines. If not already existing, we suggest installation of a by-

pass to allow the machine to be isolated from the plant to facilitate maintenance operations. 

2.  Perform the electrical connection in accordance with any local laws and regulations after reviewing 

the dryer electrical specifications and wiring diagram. 

3.  Check the condensate drainage assembly, and connect the flexible drain hose to the draining line, 

keeping in mind that 

the condensate that’s separated by the dryer may contain oil. In order to 

dispose of it in compliance with local rules and regulations, we suggest installation of an 
oil/water separator having adequate capacity.

 

4.  Power up the dryer after having checked that the nominal voltage and line frequency are constant 

and matching the nominal values of the machine. 

The user must provide the installation with an 

adequate line protection and a ground terminal complying with the electrical rules locally in 
force.

 

 

 

In order to optimise use of the dryer, we suggest it be placed in a way that positions all the machine controls 
within easy view and access. 

A suitably sized prefilter must be installed before the dryer. Failure to install and maintain a proper 
prefilter will void the dryer warranty. The rating for this filter must be at least 10 micron.

 

 

Summary of Contents for HeatSink HSH Series

Page 1: ...hnical Manual Ensure that this Technical Manual is not removed permanently from the machine TECHNICAL MANUAL HeatSink Cycling Refrigerated Compressed Air Dryers HSH Models 10 125 SCFM ZEKS Compressed...

Page 2: ...rge parameters programming 6 3 1 3 Display Indications 7 3 1 4 Remote signalling alarm 7 3 2 Before start up 8 3 3 Start up 8 4 MAINTENANCE TROUBLESHOOTING AND DISMANTLING 4 1 Maintenance 8 4 2 Troubl...

Page 3: ...or others without ZEKS s prior written approval The effects of corrosion erosion and normal wear and tear are specifically excluded Performance warranties are limited to those specifically stated wit...

Page 4: ...c shock by providing an alternate lower resistence route for the electrical current Ground must be established with a bare grounding wire sized according to the voltage and minimum branch circuit requ...

Page 5: ...sure to leave sufficient clearance 20 inches 500 mm around the dryer to allow adequate cooling of the machine and for maintenance and or control operations The incoming air must be free of smoke or f...

Page 6: ...nergy and avoid heat exchanger freezing This situation can happen when ambient temperature is low and there is no compressed air load Energy Saving System A patented 3 layer air glycol freon heat exch...

Page 7: ...NOTE when the controller is in the OFF position some parts of the dryer may still be energized Therefore for safety purposes disconnect the electrical power before performing any maintenance operatio...

Page 8: ...rms Alarm output ON Refrig Compressor output OFF Fan output ON Drain cycle standard Call your local ZEKS distributor PCd Glycol circuit malfunction Alarm output ON Refrig Compressor output ON Fan outp...

Page 9: ...if the condensate drain is working properly 9 Check if all connecting pipes are properly tightened and fixed Before disconnecting the dryer from electrical power supply use ON OFF button on controlle...

Page 10: ...an or replace the drainage solenoid valve if clogged jammed Check the C8 and C9 parameters of the electronic control board if the trouble persists replace it No loss condensate drain is not functionin...

Page 11: ...vaporator Check the probe if the trouble persists replace it Check the electronic control board if the trouble persists replace it Contact ZEKS to check the gas charge Clog Check if the compressed air...

Page 12: ...the relevant packaging in compliance with the local rules and regulations Pay particular attention to the refrigerant as it contains part of the refrigeration compressor lubricating oil Always contact...

Page 13: ...12 Flow Diagram HeatSink HSH Dryers 10 125 SCFM...

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Reviews: