14

 Installation 

  General installation requirements 

The ComfoSpot 50 is intended exclusively for installation in an outside wall, where the side air passage openings must be 
located on the inner side, vertically and with the thumb wheel for shutter adjustment on the right side. 
The following requirements and precautions at the installation site must be taken into account: 

 

WARNING

 

Observe accident prevention regulations 

Observe the accident prevention regulations when setting up the installation site. 
Secure the outside area against falling parts.

 

 

 

WARNING

 

Danger due to escaping gas or electric shock 

Make sure that there are no supply lines (e.g. electricity, gas, water) in the area of the external wall opening. 
Ensure that the external wall opening meets the static requirements on site.

 

 

 

WARNING

 

Risk due to electric shock 

Observe the country-specific standards/regulations for compliance with the protection areas for installation in rooms 
with a bathtub or shower with regard to the IP11 degree of protection applicable to the ventilation unit. 

 
 

NOTE

 

The electronics/control unit can be damaged by static charge; which is why you must always take measures to prevent 
electrostatic discharge when handling the control unit (e.g. by wearing an anti-static armband). 

 Installation 

preparations 

4.2.2.1  Preparations for installing the wall mounting pipe 

Prior to installing the ventilation unit, an appropriate wall mounting pipe must already be installed in the outside wall at the 
designated installation location. It must be adjusted flush with the dimensions of the final wall structure. 
The square wall mounting pipe, intended in particular for new buildings, should be integrated in the outside wall construction 
in the course of constructing the outside wall. The round wall mounting pipe is to be inserted after drilling a core hole (

 

340 mm) into the drill hole of the outside wall. 

NOTE

 

Installation of the ComfoSpot 50 requires the use of the round or square wall mounting pipe. 
Observe the respective enclosed instructions on professional installation when installing the wall mounting pipe. 

4.2.2.2  Preparations for installing electrical connections 

The mains supply line for the power supply must be installed in the area of the bottom left side of the unit and, where 
applicable, the control cable for connecting an optional external control panel, must be installed up to the area of the bottom 
right side of the unit. The cable ends should protrude approx. 10 cm out of the wall surface in the respective area of the 
cable entry point of the bottom cover of the interior cover.

 

   

   

 

 
 
 
 
 

Summary of Contents for ComfoSpot 50

Page 1: ...Decorative Radiators Comfortable indoor ventilation Heating and cooling ceiling systems Clean air solutions User manual on operation and installation for operators and installers Zehnder ComfoSpot 50...

Page 2: ...property of Zehnder Group Publication as a whole or in parts requires the written approval of Zehnder Group In house duplication designated for the evaluation of the product or for proper use is permi...

Page 3: ...ements of the control panel 6 Description of the operating functions and signals 7 Options for ventilation operation 9 External control panel 9 Operation via networking 9 Automatic operation via senso...

Page 4: ...iciently qualified for the respective work involved Qualification of target group 1 3 1 1 Users Users must be instructed by qualified personnel as follows Instruction in hazards when handling electric...

Page 5: ...supply unless instructions to the contrary are listed in the manual Following installation all parts that could lead to personal injury are protected by the housing The unit cannot be opened without...

Page 6: ...acade finish Intended use also includes observing all instructions in the user manual In the event of improper use the Zehnder Group accepts no liability for any damage that may occur and no warranty...

Page 7: ...unit fully automatic demand controlled ventilation operation is possible An enthalpy exchanger which can transfer both humidity and heat owing to the physical characteristics is used in the ComfoSpot...

Page 8: ...l has touch sensitive buttons and LED status indicators NOTE The ventilation unit can be operated at the same time with the internal and the external control panel Item Description A Facade finish ext...

Page 9: ...up Fan speed 3 FS3 Increased ventilation The ventilation unit runs at a higher ventilation level 40 m h to reduce peak loads e g when several people are present LED1 4 light up Fan speed 4 FS4 Intensi...

Page 10: ...e LED display is switched off If any key is touched the LED indicator will be activated again Touching the button brings about no change to the operating mode however Standby mode The unit can be swit...

Page 11: ...s switched off Display of LED1 3 as example Frost protection mode From an outside air temperature of 4 C the frost protection function is automatically activated In frost protection operating mode the...

Page 12: ...ting mode with humidity control 3 2 3 2 Functional principle of CO2 VOC sensor NOTE The CO2 sensor module and the VOC sensor module are each combined with a humidity temperature sensor The CO2 sensor...

Page 13: ...unit is equipped with two air filters of filter class ISO Coarse 70 as standard Retrofitting with filters of filter class ISO ePM10 80 is possible preferably the higher quality ePM10 filter is inserte...

Page 14: ...the bottom cover of the interior cover next to the filter compartment in each respective case Make sure that the filter is not pushed into the filter compartment with force 7 Insert the filter caps a...

Page 15: ...onger be mechanically ventilated This may result in moisture and mould problems in the room that requires ventilation 4 Chapter for qualified personnel Installation requirements The following requirem...

Page 16: ...rge when handling the control unit e g by wearing an anti static armband Installation preparations 4 2 2 1 Preparations for installing the wall mounting pipe Prior to installing the ventilation unit a...

Page 17: ...unit either to the wall thickness or to the measure of length of the wall mounting pipe by shortening the EPP housing extension NOTE The cut must be performed all around perpendicular to the axis of t...

Page 18: ...the openings for the electrical connections and fix the bottom cover of the interior cover in place using the screw from the installation set or the alternatively selected fixing material Relocating...

Page 19: ...control panel carrier Restore the plug connection between the ribbon cable and control panel NOTE Watch out for the reverse polarity protection for the post connection when connecting 6 Install the ri...

Page 20: ...Der The power supply is connected after the final positioning of the unit in the wall mounting pipe In doing so proceed as follows 1 Plug the WAGO lighting terminals 3 pieces included in the installa...

Page 21: ...mounting material suitable for the facade construction The professional and safe installation is to be checked and the responsibility of the technical crew performing the work NOTE The exterior wall p...

Page 22: ...ten the four screws from the supplied installation kit for the top cover of the outside wall panel on the bottom cover of the outside wall panel NOTE In general the top cover of the outside wall panel...

Page 23: ...ing pipe until the PVC cover for the control board is freely accessible 5 Remove the PVC cover of the control board at the side of the ribbon cable entry out of the slot on the EPP housing and grippin...

Page 24: ...EPP housing tight when doing so 10 Following the inspection install all parts whilst considering the restoration of all electrical connections in the reverse order 11 Restore the power supply and set...

Page 25: ...ension set Mounting position Horizontally in the wall mounting pipe air passage openings laterally vertical on the interior cover and outside wall panel thumb wheel for shutter adjustment AT THE RIGHT...

Page 26: ...370 330 Bottom cover for outer panel View from outside EHA ODA 330 360 Angular structural shell set View from outside Angular structural shell set View from inside 40 areas for cable entry 35 90 4x fa...

Page 27: ...25 Terminal scheme...

Page 28: ...ehnder Group Deutschland GmbH Almweg 34 77933 Lahr Deutschland T 49 7821 586 392 F 49 7821 586 406 sales international zehndergroup com www international zehnder systems com PDE Manual_CS50_V4 0_V0621...

Reviews: