Commissioning & Inspection Record
This should be used to record all installation details. The Commissioning Engineer should use the following Parts
1 to 3, to record important information relating to the installation, of which, copies should be given to the Building
Control Body (BCB), the Developer, the Installer and also be incorporated into the Homeowner Pack for the
homeowner to keep.
Part 1
System details and declarations
Part 2a Installation details
Part 2b Inspection of installation
Part 3
Airflow measurement test and commissioning details
Part 1 - System details and declarations
1.1 Installation Address Details
Dwelling name/number
Street
Locality
Town
County
Post Code
1.2 Installation Details
System classification
1
System...
Enter System 1 to 4 as defined by Approved Document F 2010
Manufacturer
Model numbers
Serial number (where available)
Location of fan units
1.
2.
3.
4.
5.
1
Note.
If a system has been installed that is not defined by System 1 to 4 in Approved Document F, further
installation checks and commissioning procedures may be required. Seek particular guidance from the
manufacturer for these systems.