Commissioning & Inspection Record

 

 

 

 This should be used to record all installation details. The Commissioning Engineer should use the following Parts 

1 to 3, to record important information relating to the installation, of which, copies should be given to the Building 

Control Body (BCB), the Developer, the Installer and also be incorporated into the Homeowner Pack for the 

homeowner to keep. 

Part 1  

System details and declarations 

Part 2a  Installation details 

Part 2b  Inspection of installation 

Part 3  

 Airflow measurement test and commissioning details

Part 1 - System details and declarations

1.1 Installation Address Details

Dwelling name/number

Street

Locality

Town

County

Post Code

1.2 Installation Details

System classification

1

System...

Enter System 1 to 4 as defined by Approved Document F 2010

Manufacturer

Model numbers

Serial number (where available)

Location of fan units

1.

2.

3.

4.

5.

1

Note.  

If a system has been installed that is not defined by System 1 to 4 in Approved Document F, further 

installation checks and commissioning procedures may be required. Seek particular guidance from the 

manufacturer for these systems.

Summary of Contents for ComfoAir 200

Page 1: ...Ventilation system ComfoAir Standard Manual for the user Cooling Fresh Air Clean Air Heating ComfoAir 200 ComfoAir 180 ComfoAir 550 ComfoAir 350 ComfoAir 180...

Page 2: ...properly installed according to the instructions and guidelines in the installer manual of the unit The unit can be used by Q children aged from 8 years and above Q persons with reduced physical capab...

Page 3: ...ng an overrun timer for the bathroom switch 9 2 7 Setting a delay timer for the bathroom switch 10 2 8 Setting the delay timer for the filter alert 10 2 9 P menus for the user 11 3 CE certification an...

Page 4: ...EN 4...

Page 5: ...afety regulations warnings comments and instructions given in this document Personal injury or damage to the unit can arise from non compliance with the safety regulations warnings comments and instru...

Page 6: ...icating the set ventilation level Indicating a malfunction or filter alert Indicating if the bypass is open Turning the supply fan on and off Indicating and setting the comfort temperature Setting the...

Page 7: ...ed Clean or replace the filters as mentioned in the Maintenance chapter The letter A is flashing at the left of the display with one or two numbers on the right of the display The current malfunction...

Page 8: ...fireplace the unit is fitted with an open fire programme When needed the installer or service engineer can turn this programme on If the open fire programme is turned on the supply fan cannot be turne...

Page 9: ...ed to the default screen 2 6 Setting an overrun timer for the bathroom switch The ventilation setting can be increased for a set time This can be useful when additional ventilation is needed for a sho...

Page 10: ...alert How fast the filters of the unit need cleaning or replacing depends on the air quality of the environment In the countryside the filters may not pollute as fast as in urban places Therefore the...

Page 11: ...Time delay values Submenu Description Minimum Maximum General reset P21 Only applies to systems fitted with a bathroom switch Delay timer for the bathroom switch to switch to high position Q x minute...

Page 12: ...o alter previously delivered products Liability The unit has been designed and manufactured for use in balanced ventilation systems incorporating Zehnder heat recovery systems Any other application is...

Page 13: ...ement or any other compelling reasons If the power to the unit is disconnected mechanical ventilation of the dwelling will cease This can lead to a build up of moisture and result in problems with mou...

Page 14: ...seconds until the filter warning disappears 2 Disconnect the power from the unit 3 A ComfoAir180 A ComfoAir 200 Remove the handles A from the unit A A ComfoAir 350 A A ComfoAir 550 4 B ComfoAir 200 B...

Page 15: ...f the valves 4 3 Condensation drain Ensure that the water seal u bend connected to the domestic waste water system is always full of water 4 4 Maintenance by the installer or service engineer Not all...

Page 16: ...t 2b Inspection of installation Part 3 Airflow measurement test and commissioning details Part 1 System details and declarations 1 1 Installation Address Details Dwelling name number Street Locality T...

Page 17: ...iled here Description of installed controls e g timer central control humidistat PIR etc Location of document override controls Signature Number if applicable Date of Installation completion 2 2 Insta...

Page 18: ...protection packaging been removed including background ventilators such that system is fully functional Yes No For ducted systems has the ductwork installation been installed in such manner that air r...

Page 19: ...5 1b in ADF Kitchen Bathroom En Suite Utility Other Other Other 3 4 Air Flow Measurements supply system 4 only Room reference location of terminals Measured Air Flow High Rate l s Design Air Flow Hig...

Page 20: ...EN 20 3 6 Test Engineer s Details Name Company Address Line 1 Address Line 2 Telephone Number Post Code Signature Competent Person Scheme Registration if applicable Date of test...

Page 21: ...hs after installation Activity Y1 Y2 Y3 Y4 Y5 Y6 Y7 Clean the filters 12 months after installation Activity Y1 Y2 Y3 Y4 Y5 Y6 Y7 Replace the filters Clean the valves Inspect and clean the condensation...

Page 22: ...installation Activity Y8 Y9 Y10 Y11 Y12 Y13 Y14 Clean the filters 12 months after installation Activity Y8 Y9 Y10 Y11 Y12 Y13 Y14 Replace the filters Clean the valves Inspect and clean the condensatio...

Page 23: ...23 EN...

Page 24: ...HKQGHU RPIRV VWHPV GLYLVLRQ RI HKQGHU URXS 8 WG 8QLW URRNVLGH YHQXH 5XVWLQJWRQ HVW 6XVVH 1 7 FRPIRV VWHPV HKQGHU FR XN ZZZ HKQGHU FR XN ZGNL Manual_849050685 V0614 EN Subject to change...

Reviews: